contractors.fyi
Sign in

Titan Solar Power Ca Inc

Panel upgrade electrician working in San Francisco.

  • License 1062072 was not in the state's records on Sep 23, 2026

16 panel upgrade jobs on San Francisco permits, 2021 to 2023.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1062072 was not in the state's records on Sep 23, 2026Problem
Jobs on record16 panel upgrade jobs on San Francisco permits, 2021 to 2023Every permit we have for them is panel upgrade.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $12,550 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 4 jobsQ1 2022: 2 jobsQ2 2022: 3 jobsQ3 2022: 1 jobQ4 2022: 2 jobsQ1 2023: 2 jobsQ3 2023: 2 jobsBusiest: 4 jobsLatest: 2 jobs20222023
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2021.

Where they work most

  • 941316 jobs
  • 941125 jobs
  • 941243 jobs
  • 941331 job
  • 941321 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 7, 2023Panel upgradeInstall 125a subpanel94133$1,000
Aug 3, 2023Panel upgradeInstall (n)200a bus subpanel with 100a main breaker94112$1,000
Mar 23, 2023Panel upgrade94124$14,000
Feb 16, 2023Panel upgradePlan #4471r1. residential solar permit94131$21,400
Oct 20, 2022Panel upgradePv solar plan# 4807: 24 number of ppv modules: 400 watts per module: 9.6 system (dc) kw: service…94124$26,500
Oct 20, 2022Panel upgradePv solar plan# 3799r1: 18 number of pv modules: 360 watts per module: new sub panel: 6.48 system…94131$2,200
Aug 24, 2022Panel upgradePlan #4651. residential solar permit94124$15,500
Jun 22, 2022Panel upgrade, 9.6 kWSolar: install 24 roof mounted pv mods, 400w/mod, 9.6kw total rating94131$21,400
May 5, 2022Panel upgrade, 6.8 kWPv plan #4402. 17 pv modules x 400 watts / 1000 = 6.8 kw94132$16,100
May 5, 2022Panel upgrade, 5.55 kWPv plan #4059 r1. 15 pv modules x 370 watts / 1000 = 5.55 kw94112$11,100
Feb 1, 2022Panel upgrade, 4.07 kWPv plan #3911 r1. 11 pv modules x 370 watts / 1000 = 4.07 kw94112$2,500
Jan 18, 2022Panel upgradePlan #3799-r1, service upgrade, 18 pv modules94131not stated
Dec 28, 2021Panel upgradePv plan 3799 r1. 18 pv modules, 0 watts per module, 0 (dc) kw94131not stated
Dec 28, 2021Panel upgrade94112$11,100
Nov 30, 2021Panel upgrade94112$8,000
Oct 22, 2021Panel upgradePlan #3799. residential solar permit94131$14,960

What to ask before you hire

About Titan Solar Power Ca Inc

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Titan Solar Power Ca Inc

Five quick questions. We pass your request to Titan Solar Power Ca Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Titan Solar Power Ca Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94131 and 94112

Also on our Los Angeles list.

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.