contractors.fyi
Sign in

Urban Energy

EV charger installer based in San Rafael. Licensed since 2012.

  • License active
  • Workers' comp on file

105 jobs on San Francisco permits, 2021 to 2026: 60 EV charger installations, 44 panel upgrades, 1 solar installation. 7th most EV charger permits of 129 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 971231, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2012
Jobs on record105 jobs on San Francisco permits, 2021 to 2026: 60 EV charger installations, 44 panel upgrades, 1 solar installationThey are based in San Rafael. Work outside San Francisco is not in these records.7th most EV charger permits of 129 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.Of their 60 EV charger permits, 21 mention a panel upgrade.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 971231 on CSLB

Cost and timing

Permit value (not a price)

Most of their recent permits list $3,000

32 of their 32 EV charger permits with a value in the last 12 months list exactly that, which looks like a set figure rather than a price. What EV charger jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a EV charger permit stays open about 27 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long EV charger jobs take.

Track record

50 jobs in the last 12 months, up from 3 the year before

Q4 2021: 1 jobQ1 2022: 1 jobQ2 2022: 5 jobsQ3 2022: 5 jobsQ4 2022: 5 jobsQ1 2023: 2 jobsQ2 2023: 24 jobsQ3 2023: 2 jobsQ4 2023: 2 jobsQ2 2024: 4 jobsQ3 2024: 1 jobQ4 2024: 3 jobsQ4 2025: 1 jobQ1 2026: 17 jobsQ3 2026: 32 jobsBusiest: 32 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 32 jobs, July to September 2026. Across San Francisco, all contractors together had 19% more EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9410935 jobs
  • 9411019 jobs
  • 9410718 jobs
  • 941276 jobs
  • 941175 jobs

Jobs by kind of work

Latest jobs

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIP
Sep 10, 2026Panel upgrade94109
Sep 10, 2026Panel upgrade (×3, same day)94109
Sep 10, 2026Panel upgrade94109
Sep 10, 2026Panel upgrade (×11, same day)94109
Sep 10, 2026EV charger94109
Sep 10, 2026EV charger (×3, same day)94109
Sep 10, 2026EV charger94109
Sep 10, 2026EV charger (×11, same day)94109
Mar 3, 2026EV chargerInstallation of (1) ev charger with meter tap connection of the existing utility meter94107
Mar 3, 2026EV charger (×14, same day)94107
Feb 24, 2026EV charger94107
Feb 2, 2026Solar, 5.72 kWSolar permit: installing 14 solar pv modules, 440 watts per module, total no94127
Oct 2, 2025EV chargerEv charger outlet94114
Nov 18, 2024Panel upgrade200-600amp service upgrade94102
Oct 29, 2024Panel upgrade200amp common panel & 8 ev chargers94109
Oct 29, 2024EV charger200amp common panel & 8 ev chargers94109
Jul 26, 2024Panel upgradeWe will be replacing the current electrical panel with a span panel94123
May 14, 2024Panel upgradeRemodel - electrical work - replace outlets and lights94103
May 9, 2024Panel upgradeHouse panel replacement for the building94115
Apr 23, 2024Panel upgradeRewire - kitchen bath, living bedroom ,sub panel94117
Apr 18, 2024EV chargerSingle ev charger with a meter tap94109
Oct 30, 2023Panel upgradeInstalling of sub panel electric oven landscape lighting in rear replace 4 lights94131
Oct 10, 2023Panel upgradeReplacement of: (1) meter with disconnect (1) larger sub panel in basement (4) sub panels on floor…94115
Jul 31, 2023Panel upgradeInstall span panel instal span drive - level 2 ev charger replace main breaker with 100amp main…94118
Jul 31, 2023EV chargerInstall span panel instal span drive - level 2 ev charger replace main breaker with 100amp main…94118
Jun 29, 2023EV charger94110
Jun 28, 2023EV chargerInstall wall box level 2 ev charger94110
Jun 28, 2023EV chargerInstall wallbox level 2 ev charger94110
Jun 28, 2023EV charger (×2, same day)94110
Jun 28, 2023EV chargerInstall wallbox level 2 ev charger94110
Jun 28, 2023EV charger94110
Jun 7, 2023EV charger94110
May 31, 2023EV chargerInstall level 2 electric car charger94110
May 31, 2023EV charger (×8, same day)94110
May 15, 2023EV chargerInstall of leval 2 electric car charger94110
May 4, 2023Panel upgradeReplace subpanels with new span panel94115
May 4, 2023EV chargerReplace subpanels with new span panel94115
Apr 26, 2023Panel upgradeInstallation of one (1) tesla wall connector94131
Apr 18, 2023Panel upgradeReplace the existing main service panel located in the basement with span panel94127
Apr 18, 2023EV chargerLevel 2 ev charger installation94112

What to ask before you hire

About Urban Energy

  • Ask what the warranty covers and for how long, in writing.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Urban Energy

Five quick questions. We pass your request to Urban Energy.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Urban Energy. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 94109 and 94110

See all 129 EV charger installers in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.