contractors.fyi
Sign in

W E B Electric

Panel upgrade electrician working in San Francisco. Licensed since 1989.

  • License active
  • Workers' comp on file

21 jobs on San Francisco permits, 2022 to 2026: 18 panel upgrades, 3 EV charger installations. 204th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 561577, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 1989
Jobs on record21 jobs on San Francisco permits, 2022 to 2026: 18 panel upgrades, 3 EV charger installations204th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 561577 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 5 the year before

Q3 2022: 2 jobsQ1 2024: 4 jobsQ2 2024: 8 jobsQ4 2024: 3 jobsQ2 2025: 1 jobQ3 2025: 1 jobQ2 2026: 1 jobQ3 2026: 1 jobBusiest: 8 jobsLatest: 1 job2023202420252026
Each bar is 3 months of permits. The tallest is 8 jobs, April to June 2024. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941094 jobs
  • 941102 jobs
  • 941242 jobs
  • 941122 jobs
  • 941162 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Jul 29, 2026Panel upgradeReplace existing 200-amp panel "a" with new94110$2,000
Jun 6, 2026EV chargerInstall new 240-volt, 40-amp feed to car charger94110not stated
Aug 17, 2025Panel upgradeRemove existing 200 amp federal pacific stab block panel94124$4,000
May 20, 2025Panel upgradeRemove six existing fpe stab-lock panels and replace with new94117$15,000
Dec 30, 2024Panel upgradeNew 240-volt, 30-amp feed to water heater94112$1,200
Dec 8, 2024Panel upgradeInstall 240-volt, 30-amp feed and disconnect to heat pump water heater94116$1,500
Nov 11, 2024Panel upgradeRemove and replace existing 100 amp three phase panel with new94124$6,000
May 16, 2024Panel upgrade94133not stated
May 8, 2024Panel upgrade94122not stated
Apr 30, 2024Panel upgrade94116not stated
Apr 9, 2024Panel upgradeReplace existing fpe panelboard with new94134$1,200
Apr 1, 2024Panel upgrade (×4, same day)94109not stated each
Mar 9, 2024Panel upgradeReplace existing 8/16 fpe panel with new94112$1,200
Mar 8, 2024Panel upgradeReplace existing weathered 8 ckt.panel with new 16 ckt94121not stated
Mar 8, 2024Panel upgradeReplace existing fuse box with new 12 ckt94134$1,500
Jan 25, 2024Panel upgradeInstall new 100-amp sub panel94123$1,500
Aug 22, 2022EV chargerInstall new 30-amp, 240-volt feed to future water heater94122$3,000
Jul 17, 2022EV chargerInstall 120-volt 20-amp gfi in garage94114$3,000

What to ask before you hire

About W E B Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from W E B Electric

Five quick questions. We pass your request to W E B Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to W E B Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94109 and 94110

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.