contractors.fyi
Sign in

Wolfe Painting Co

Panel upgrade electrician based in Daly City. Licensed since 1998.

  • License active
  • Workers' comp on file

36 jobs on San Francisco permits, 2021 to 2026: 21 panel upgrades, 15 remodels. 166th most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 754201, active in the state's records on Sep 23, 2026General building, paintingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 1998
Jobs on record36 jobs on San Francisco permits, 2021 to 2026: 21 panel upgrades, 15 remodelsThey are based in Daly City. Work outside San Francisco is not in these records.166th most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 754201 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $65,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

9 jobs in the last 12 months, down from 13 the year before

Q4 2021: 1 jobQ1 2022: 1 jobQ3 2023: 5 jobsQ4 2023: 2 jobsQ2 2024: 4 jobsQ3 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 7 jobsQ2 2025: 2 jobsQ3 2025: 2 jobsQ4 2025: 2 jobsQ2 2026: 4 jobsQ3 2026: 3 jobsBusiest: 7 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 7 jobs, January to March 2025. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941146 jobs
  • 941214 jobs
  • 941224 jobs
  • 941094 jobs
  • 941334 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 7, 2026RemodelAdd 1 (n) wet bar, 1 (remodel) full bath and 1 (n) bedroom on 1st floor94114$22,000
Aug 7, 2026Panel upgradeAdd full bathroom and wet bar on 1/f94114not stated
Aug 7, 2026Panel upgradeBring feeders to new subpanel box94118not stated
Jun 17, 2026RemodelKitchen remodel in kind position/new cabibets, countertop94121$40,000
Jun 17, 2026Panel upgradeMain floor: install new subpanel 125 a, 20/40. near kitchen run circuits for counter…94121not stated
Jun 5, 2026RemodelUnit #a: kitchen remodel; remove existing cabinets, countertop, sink etc94131$40,000
Jun 5, 2026Panel upgradeUnit #a - move panel box location from closet94131not stated
Dec 11, 2025RemodelDemo walls + ceilings to allow for electrical work94122$46,000
Dec 11, 2025Panel upgradeReplace knob & tube wiring throughout building, new outlets, switches lights etc94122not stated
Jul 16, 2025Panel upgradeReplace all knobs and tube wiring with new romex appropriate wiring as necessary94110not stated
Jul 7, 2025RemodelRemodel in kind kitchen94114$18,000
May 5, 2025RemodelUnit g - kitchen remodel, like for like construction94114$35,000
May 5, 2025Panel upgradeKitchen remodel, circuits for counter, plugs, d/w, g/d, range hood, range, refrig94114not stated
Mar 27, 2025Panel upgradeUpper unit: installation of new 125amp 20/40 subpanel94114not stated
Mar 24, 2025RemodelBathroom remodel - replace shower w/ new shower stall94127$24,000
Mar 24, 2025Panel upgradeBring circuits up for gfci oulets, fan, washlet, heated holder, install new 20/40 subpanel in garage94127not stated
Mar 4, 2025RemodelUnit 301. remodel of kitchen (same position), two bathrooms/one shower94123$54,000
Feb 11, 2025RemodelRemodel in kind of bathroom: new shower pan, tile, fixtures, shower valve etc94118$19,000
Feb 11, 2025Panel upgradeRef to bldg pa# 202502100063: install circuit for panel box to gfci in bathroom, install lights, 1…94118not stated
Jan 13, 2025Panel upgradeUnit d: electrical work ref to bldg pa #201712156650 (legalize 1 unit) included 1 kitchen, 1 bath,…94117not stated
Oct 8, 2024Panel upgradeAbandon knob & tube wiring94122not stated
Oct 8, 2024Panel upgradeWork at 724-a94122not stated
Aug 20, 2024Panel upgradeUnit 603- panel box to be removed from closet . install new subpanel in hallway94109not stated
May 8, 2024Panel upgradeAdd new subpanel in new location94109not stated
Apr 12, 2024RemodelUnit 3: kitchen remodel, new cabinets, sink in e) location94109$36,000
Apr 12, 2024RemodelUnit 1: 460 sf sheetrock replac94117$18,000
Apr 12, 2024Panel upgradeUnit 6. bring dedicated circuit from subpanel for new outlet94117not stated
Nov 28, 2023RemodelOne kitchen remodel-change cabinets and countertops in place94121$55,000
Nov 28, 2023Panel upgradeBring new subpanel from main bedroom wall, run new circuit (dishwasher, range, counter plugs,…94121$65,000
Sep 20, 2023RemodelTo correct nov# 202312812. one kitchen remodel w/o permit94133$18,000
Sep 20, 2023RemodelTo correct nov# 202313106. kitchen remodel without permit94133$20,000
Sep 20, 2023RemodelTo correct nov# 202312602. kitchen and bath remodel w/p permit94133$20,000
Sep 20, 2023Panel upgradeCorrect nov # 202312602. kitchen and bathroom remodel94133not stated
Aug 10, 2023Panel upgradeUnit 11 ref to bldg pa #202306059193. move 100 amp electrical panel approx 10 ft94109not stated
Mar 16, 2022Panel upgradeNew wiring, new panel box bpa 20220316015694115not stated
Oct 12, 2021Panel upgradeNo details on the permit94115not stated

What to ask before you hire

About Wolfe Painting Co

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Wolfe Painting Co

Five quick questions. We pass your request to Wolfe Painting Co.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Wolfe Painting Co. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94114 and 94121

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.