55 jobs on Seattle permits, 2021 to 2025: 28 panel upgrades, 27 EV charger installations. 55th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ACTIVE*088MS, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record55 jobs on Seattle permits, 2021 to 2025: 28 panel upgrades, 27 EV charger installationsThey are based in Lynnwood. Work outside Seattle is not in these records.55th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,325 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

1 job in the last 12 months, down from 6 the year before

Q4 2021: 8 jobsQ1 2022: 1 jobQ3 2022: 4 jobsQ4 2022: 3 jobsQ1 2023: 4 jobsQ2 2023: 6 jobsQ3 2023: 4 jobsQ4 2023: 4 jobsQ1 2024: 4 jobsQ2 2024: 6 jobsQ3 2024: 4 jobsQ4 2024: 1 jobQ1 2025: 4 jobsQ3 2025: 1 jobQ4 2025: 1 jobBusiest: 8 jobsLatest: 1 job2022202320242025
Each bar is 3 months of permits. The tallest is 8 jobs, October to December 2021. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981167 jobs
  • 981027 jobs
  • 981337 jobs
  • 981194 jobs
  • 981124 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 6, 2025EV chargerInstall 1 new 40A 208V single phase EV Charger98126$3,000
Sep 23, 2025EV charger98109$2,500
Mar 31, 2025Panel upgradeReplace existing 200Amp Service with 400Amp Service and re-wire property98119$50,000
Mar 20, 2025EV chargerInstall (8) Level 2, 40A, 240V, 1PH, EV Chargers [3/20/25 KEF - Plan set approved.]98116$18,000
Mar 14, 2025Panel upgradeAdd five 20A 120V circuits and two outlets for the following: Pipe in 2 circuits in the same room…98112$2,000
Feb 18, 2025EV chargerInstall (8) Level 2, 40A, 240V, 1PH, EV Chargers [C.Kenefick 3/10/2025 - requires plan review.];…98116$18,000
Nov 27, 2024EV charger98119$2,000
Sep 16, 2024EV chargerInstall new 40A 208V single phase EV Charger [10-3-24 DR - After review of calculations (in…98116$2,000
Sep 6, 2024EV charger98109$2,000
Sep 4, 2024Panel upgradeReplace (3) 100A Zinsco panels and disconnects98103$6,000
Aug 5, 2024EV chargerInstall (1) Level 2 EV Charger98112$3,000
Jun 27, 2024EV chargerInstall (1) new EV Charger 208V, 1 phase, 32amp98121not stated
Jun 26, 2024Panel upgradeReplace (1) 60A and (1) 30A 240V 1phase common area fuse panelsNot listed$1,700
Jun 11, 2024EV chargerInstall (1) new EV Charger98121$2,500
May 21, 2024EV chargerHome Remodel[12/4/2024 JBC Removed Feeder and added EV Charger to permit]98136$10,000
May 14, 2024Panel upgradeReplace (21) 50amp fuse panels in residential units98119$17,000
Apr 2, 2024Panel upgradeHome Remodel [C.Kenefick 8/22/24 - Service changed from 200a to 320a, fee applied98119$10,000
Feb 29, 2024EV chargerInstall (13) new 20A, 120V, receptacles for level 1 EV Chargers98116$9,000
Feb 27, 2024EV chargerInstall (1) new level 2, 40A, 208V, single phase EV Charger98116$2,300
Feb 19, 2024Panel upgradeInstall new surface mounted 200amp meter and disconnect Adjacent to existing surface mount meter98136$12,000
Feb 19, 2024EV charger2 120 volt 20amp circuits [C.Kenefick 3/7/24- additional fees added to permit: lighting, switches,…Not listed$1,000
Dec 18, 2023EV chargerInstall two 50A, 240V dedicated circuits for to EV charger outlets.[11/6/2025 JBC Added Renewal to…98102$1,700
Dec 6, 2023Panel upgrade Electrical discovery and disconnect of existing wiring in upper floor.  Install new 200-amp…98103$15,000
Nov 14, 2023Panel upgradeReplace an existing 600a panel and (3) 175a water heater circuits in a building that was vandalized98125$4,175
Oct 31, 2023Panel upgradeReplace (1) 200A 3phase 208V panel & (1) 100A single phase 208V panel98101$2,250
Sep 19, 2023EV chargerInstall (4) level 2, single phase, 16A EV chargers98102$4,000
Aug 31, 2023EV chargerInstall (1) single phase, 40amp, 240 volt, level 2 EV ChargerNot listed$2,000
Aug 7, 2023EV chargerInstall (1) new EV Charger 208V, 1 phase, 32amp98121$1,800
Jul 12, 2023EV chargerInstall (1) level 2, 208V, single phase EV charger98116$2,000
Jun 20, 2023EV chargerInstall (2) new 280V, 40A level 2 EV chargers98116$2,000
Jun 13, 2023Panel upgradeReplace unit 302 Zinsco panel with UL approved panel; [6/2/26 RN Closed permit, Closed Without…98102$2,500
Jun 7, 2023EV chargerInstall new 125-amp Main breaker panel at DADU; include UFER ground Install (1) 1" below grade…98117$15,000
May 24, 2023EV chargerInstall (3) new 208V, 40A, level 2 EV ChargersNot listed$9,000
Apr 24, 2023EV chargerInstall (6) new 40Amp EV chargers98102$15,000
Apr 6, 2023Panel upgradeReplace existing 200amp panelNot listed$1,200
Mar 14, 2023Panel upgradeReplace Zinsco panel with UL approved panel98133$1,300
Mar 9, 2023EV chargerInstall 240V 50A circuit for EV charger98199not stated
Feb 13, 2023Panel upgradeReplace Zinsco panel with UL approved panel98133$1,200
Feb 10, 2023Panel upgradeInstall a 100 amp feeder and subpanel from the main electrical panel in the stairwell to the…98122$2,325
Dec 8, 2022Panel upgrade98133$1,200

What to ask before you hire

About Active Engineering

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Active Engineering

Five quick questions. We pass your request to Active Engineering.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Active Engineering. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98116 and 98102

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.