contractors.fyi
Sign in

Black Sheep Electric LLC

Panel upgrade electrician based in Lynnwood.

  • License active
  • No current bond on the state's list for this license

88 jobs on Seattle permits, 2021 to 2025: 57 panel upgrades, 31 EV charger installations. 27th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License BLACKSE772RR, active in the state's records on Oct 3, 2026Electrical contractor, residential specialtyChecks out
Insurance and bond?No current bond on the state's list for this licenseThe state keeps no liability insurance records for electrical contractors, so ask for a certificate.Ask them
Jobs on record88 jobs on Seattle permits, 2021 to 2025: 57 panel upgrades, 31 EV charger installationsThey are based in Lynnwood. Work outside Seattle is not in these records.27th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $10,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

1 job in the last 12 months, down from 20 the year before

Q4 2021: 5 jobsQ1 2022: 9 jobsQ2 2022: 13 jobsQ3 2022: 5 jobsQ4 2022: 6 jobsQ1 2023: 4 jobsQ2 2023: 3 jobsQ3 2023: 1 jobQ4 2023: 8 jobsQ1 2024: 1 jobQ2 2024: 6 jobsQ3 2024: 6 jobsQ4 2024: 5 jobsQ1 2025: 5 jobsQ2 2025: 5 jobsQ3 2025: 5 jobsQ4 2025: 1 jobBusiest: 13 jobsLatest: 1 job2022202320242025
Each bar is 3 months of permits. The tallest is 13 jobs, April to June 2022. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9811513 jobs
  • 981037 jobs
  • 981056 jobs
  • 981025 jobs
  • 981195 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 29, 2025Panel upgradeElectrical wiring for remodel; addition of sub panelNot listed$44,000
Sep 5, 2025Panel upgradeInstall 100amp subpanel, 20amp circuit in bathroom for towel bar and (2) outlets, install (3) can…98144$19,600
Aug 22, 2025Panel upgradeKitchen, bath remodel, sub panel ; [9/9/26 RN Renewal/Reinstatement fee added]Not listed$14,000
Jul 20, 2025Panel upgradeMove and replace existing fuse panel in kitchen with a new electrical panel in Office, 6-8 ft away98102$9,225
Jul 9, 2025Panel upgradeDemo existing knob and tube as able, exception being the top floor that will be done at a later date98115$26,000
Jul 9, 2025Panel upgradeRe-wire and 200amp service upgrade98103$23,000
Jun 24, 2025Panel upgradeInstall new 240V 100amp circuit in garage for new Sub Panel98105$3,210
Jun 24, 2025Panel upgradeSwap out existing 200amp panel and replace with new 200amp panel and whole house surge protections98115$4,820
Jun 11, 2025EV chargerInstall 240v 50amp circuit for car charger98119$2,750
Apr 24, 2025Panel upgradeReplace meter base with new 200amp overhead service with main disconnect98115$11,200
Apr 7, 2025EV charger98112$1,000
Mar 18, 2025Panel upgradeDemo exiting wiring for new layouT.  Move and install new outlets, switches and thermostat in…98122$6,890
Feb 26, 2025Panel upgradeInstall 240v 40amp circuit for new sub panel for in shed98125$2,220
Feb 20, 2025Panel upgradeSwap out existing panel with new panel like for like, remove all knob and tube with new wire98103$24,800
Jan 28, 2025Panel upgradeInstall a new 26KWK whole house generator to back up existing 200amp service98133$13,545
Jan 7, 2025EV chargerRemove existing water heater power box and relocate wire to inside of closet, new 4-square box with…98125$1,546
Dec 5, 2024Panel upgradeUpgrade electrical service with a new 200amp overhead meter base and 200amp main disconnect98115$8,875
Nov 18, 2024Panel upgradeRelocate panel to garage and expand to a new 200amp main breaker with whole house surge protection98105$16,865
Nov 18, 2024EV chargerRelocate panel to garage and expand to a new 200amp main breaker with whole house surge protection98105$16,865
Nov 7, 2024EV chargerInstall 240v 50amp circuit and 40amp breaker for car charger98115not stated
Nov 1, 2024Panel upgradeNew 200amp service and upstairs remodel[11/6/2024 JBC Added 100amp Garage Panel to permit.]98115$6,500
Sep 12, 2024Panel upgradeReplace existing panel with new 200amp main breaker panel and whole house surge protection98115$9,950
Aug 20, 2024Panel upgradeReplace 125amp panel with a new Square D Homeline 125amp panel with whole house surge protection98133$3,180
Aug 13, 2024Panel upgradeRewire upstairs of residence, replace existing sub-panel with new98122$40,000
Aug 1, 2024Panel upgradeReplace existing panel with a new 200amp 40 space panel with surge protection98103$34,500
Aug 1, 2024EV chargerReplace existing panel with a new 200amp 40 space panel with surge protection98103$34,500
Jul 2, 2024EV charger98199$1,810
Jun 12, 2024EV chargerNo details on the permit98115not stated
Jun 10, 2024EV charger98102not stated
Jun 6, 2024EV chargerEV Charger, rewire oven circuit, exterior lighting98119$11,000
May 14, 2024Panel upgradeInstall (1) new 120v 20amp circuit, 2nd floor bathroom outlets98102$1,670
May 9, 2024Panel upgradePanel relocation, kitchen remodel, bathroom remodels, add homeruns98115$17,500
Apr 17, 2024EV chargerInstall 240v 50amp circuit for New NEMA 14-50 receptacle for car charger, replace existing 40amp…98102$1,335
Jan 19, 2024Panel upgradePanel/serivce upgrade98144$11,455
Nov 9, 2023Panel upgradeRewire main level to current electrical code and install 200amp service98144$20,000
Nov 1, 2023EV charger98122$1,095
Oct 26, 2023EV charger98119not stated
Oct 23, 2023Panel upgradeMain floor rewire, install 125amp subpanel98105$25,000
Oct 16, 2023Panel upgradeReplace panel with a new 200amp main breaker panel98177$15,700
Oct 16, 2023EV charger98115$1,100

What to ask before you hire

About Black Sheep Electric LLC

  • Ask for proof of liability insurance and a current bond.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Black Sheep Electric LLC

Five quick questions. We pass your request to Black Sheep Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Black Sheep Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98115 and 98103

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.