contractors.fyi
Sign in

Cascade Integration

Panel upgrade electrician based in Bothell.

  • License active
  • Bond on file

41 jobs on Seattle permits, 2021 to 2025: 29 panel upgrades, 7 solar installations, 5 EV charger installations. 52nd most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License CASCAII964KG, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record41 jobs on Seattle permits, 2021 to 2025: 29 panel upgrades, 7 solar installations, 5 EV charger installationsThey are based in Bothell. Work outside Seattle is not in these records.52nd most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $18,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 7 the year before

Q4 2021: 7 jobsQ1 2022: 6 jobsQ3 2022: 2 jobsQ4 2022: 3 jobsQ1 2023: 3 jobsQ2 2023: 3 jobsQ3 2023: 1 jobQ4 2023: 1 jobQ1 2024: 1 jobQ2 2024: 4 jobsQ3 2024: 1 jobQ4 2024: 1 jobQ1 2025: 1 jobQ2 2025: 2 jobsQ3 2025: 3 jobsQ4 2025: 2 jobsBusiest: 7 jobsLatest: 2 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 7 jobs, October to December 2021. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981017 jobs
  • 981127 jobs
  • 981194 jobs
  • 981362 jobs
  • 981031 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 30, 2025Panel upgradeChange panel out and add new lightging98101$9,000
Dec 5, 2025Panel upgradeAdd sub panel out by the dock98112$3,000
Sep 24, 2025Solar, 10 kWAdding 10KW battery storge on existing service98119$20,000
Sep 12, 2025Panel upgradeAdding sub panel in garage98103$1,500
Aug 28, 2025EV chargerKnob and Tube rewire98112$30,000
Jun 9, 2025SolarCombining two meters into one meter98112$10,000
May 9, 2025Panel upgradeThis is a can lighting retrofit project98136$100,000
Mar 25, 2025Panel upgradeUnit remodel and panel change98101$20,000
Dec 19, 2024Panel upgradeWhole house remodel and service upgradeNot listed$40,000
Aug 28, 2024Panel upgradeReplacing some cans and switches in the basement changing one of the panels to a 54 space to make…Not listed$25,000
Jun 27, 2024Panel upgradeRewire of this house boatNot listed$40,000
Jun 14, 2024EV charger, 7.2 kWAdding a 7.2kw solar system with no storage and a 50a car charger98112$19,000
Jun 14, 2024Solar, 7.2 kWAdding a 7.2kw solar system with no storage and a 50a car charger98112$19,000
May 8, 2024Panel upgradeBasement remodel with 125A sub panelNot listed$15,000
Jan 5, 2024Panel upgradePrimary bed, closet & Bath, Entry closet, Living room, Kitchen remodelNot listed$20,000
Nov 13, 2023Solar, 10 kWAdding 20--390Watt solar panels, 20--Micro inverters, Enphase combiner and 10kw of battery backupNot listed$2,200
Sep 13, 2023Panel upgradeBasement remodel and panel changeNot listed$26,000
May 17, 2023Panel upgradeREMODLE some work on all floors and install larger sub panelNot listed$32,000
Apr 17, 2023Solar, 33.54 kWInstalling a 33.54 Kw solar array with 10KW battery backup98112$70,000
Apr 13, 2023SolarAdding 18 solar panels NO BATTERY BACKUP 18 JA Solar 410w modules 18 Enphase IQ8+ Micro…Not listed$26,000
Mar 29, 2023Panel upgradeRemodel work on all floors and new 600 Amp service 3/10/2025 - AB - Renewal98112$75,000
Mar 23, 2023Panel upgradeUnit Remodel and panel change98101$18,000
Mar 6, 2023Panel upgradeUnit renovation and panel change98101$20,000
Nov 28, 2022Panel upgradeRemodel of existing apartment98101$20,000
Oct 19, 2022EV chargerAdd a car chargerNot listed$1,000
Oct 13, 2022Panel upgradeAdding a closet light ,an outlet and replacing kit under counter with low volt tape light and…98119$2,100
Aug 2, 2022EV chargerIt is a bed and bath remodel and outside car chargermain fioorNot listed$6,500
Jul 27, 2022Panel upgradeGarage Remodel98144$9,000
Mar 28, 2022Panel upgradeFull unit remodel and panel change98101$15,000
Mar 3, 2022Panel upgradeFull unit remodel and panel change98101$15,000
Mar 1, 2022Panel upgradePanel change98136$3,500
Feb 18, 2022Panel upgradeKitchen and mudroom remodel98199$15,000
Jan 19, 2022Solar, 4.32 kWInstallation of a 4.32KW solar systemNot listed$14,000
Jan 5, 2022Panel upgradeSome work on all 3 floors98126$30,000
Dec 15, 2021Panel upgradeBasement remodel, main floor knob and tube re-feedNot listed$15,000
Dec 15, 2021Panel upgradePrimary bedroom and bathroom suite remodelNot listed$15,000
Dec 7, 2021Panel upgradeKitchen, nook and dining room remodelNot listed$15,000
Dec 6, 2021Panel upgradeAdd sub panel in detached garage98119$3,000
Dec 6, 2021EV chargerAdd sub panel in detached garage98119$3,000
Nov 17, 2021Panel upgradePrimary Bathroom, upper floor bathroom, powder, upper floor hallway, main floor bedroom and garage…98107$18,000

What to ask before you hire

About Cascade Integration

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Cascade Integration

Five quick questions. We pass your request to Cascade Integration.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Cascade Integration. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98101 and 98112

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.