contractors.fyi
Sign in

Comprehensive Electrical Services

Panel upgrade electrician working in Seattle.

  • Seattle publishes no contractor license list we can check

19 jobs on Seattle permits, 2021 to 2025: 16 panel upgrades, 3 EV charger installations.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Seattle publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record19 jobs on Seattle permits, 2021 to 2025: 16 panel upgrades, 3 EV charger installationsOur Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $4,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

1 job in the last 12 months, down from 5 the year before

Q4 2021: 1 jobQ1 2022: 2 jobsQ2 2022: 2 jobsQ3 2022: 2 jobsQ4 2022: 3 jobsQ2 2023: 1 jobQ4 2023: 1 jobQ2 2024: 1 jobQ1 2025: 4 jobsQ2 2025: 1 jobQ4 2025: 1 jobBusiest: 4 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2025. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981183 jobs
  • 981123 jobs
  • 981062 jobs
  • 981032 jobs
  • 981252 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 13, 2025Panel upgradeNo details on the permit98118$2,500
Apr 22, 2025Panel upgradeService change with external disconnect on outside of homeNot listed$5,500
Mar 31, 2025Panel upgradePlace Sub -panel in garage and power EV charger98112$2,500
Mar 31, 2025EV chargerPlace Sub -panel in garage and power EV charger98112$2,500
Jan 22, 2025Panel upgradeSwap 200AMP main panel, like for like98118$3,500
Jan 22, 2025EV chargerSwap 200AMP main panel, like for like98118$3,500
Apr 4, 2024Panel upgradeRemoving old split bus panel and replacing with new98105$4,000
Dec 5, 2023Panel upgradeRemove old panel and install new panel like for like98106$2,800
Jun 20, 2023Panel upgradeReplace remaining knob and tube circuits in home, also replace old 200 amp panel with new 200 amp…98119$15,000
Nov 10, 2022Panel upgradeRemove old zinsco panel install new panel like for like98126$2,500
Oct 19, 2022Panel upgradeRemove old failing panel and install new panel like for like98106$1,800
Oct 4, 2022EV chargerInstall nema 14-50 outlet for ev charger98103$2,000
Sep 29, 2022Panel upgradeInstall new 200 amp services on detached building and install power for hot tub and outlets in…98133$6,000
Aug 14, 2022Panel upgradeRewire remaining knob and tube in home and install power and heaters in basement, replace old panel…98125$15,000
May 9, 2022Panel upgradeInstall outdoor panel and 200 amp meter base98125$4,500
Apr 20, 2022Panel upgradeReplace old FPE outdoor panel install new outdoor panel and add gas bond and inter system bond98146$3,600
Mar 29, 2022Panel upgradeReplace outdoor panel and replace old panel with new outdoor panel install new 320 amp meter base98112$5,000
Mar 9, 2022Panel upgradeReplace old 200 amp panel with new panel with main breaker also install Tesla wall connector98109$4,000
Nov 1, 2021Panel upgradeReplace panel like for like98103$4,000

What to ask before you hire

About Comprehensive Electrical Services

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Comprehensive Electrical Services

Five quick questions. We pass your request to Comprehensive Electrical Services.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Comprehensive Electrical Services. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98118 and 98112

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.