contractors.fyi
Sign in

Formula 7 Electric LLC

Panel upgrade electrician based in Redmond.

  • License active
  • Insurance and bond on file

7 jobs on Seattle permits, 2024 to 2025: 6 panel upgrades, 1 EV charger installation. 214th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License FORMU7E753OD, active in the state's records on Oct 3, 2026Construction contractorThe same business also holds license FORMU7E767KC (Electrical contractor), active in the state's records.Checks out
Insurance and bond?Bond $30,000 on file with the state, with no end date (it stays in force until the bond company cancels it)Liability insurance $1,000,000 on file with the state, until Jun 16, 2027.On file
Jobs on record7 jobs on Seattle permits, 2024 to 2025: 6 panel upgrades, 1 EV charger installationThey are based in Redmond. Work outside Seattle is not in these records.214th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $6,069 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

0 jobs in the last 12 months, down from 7 the year before

Q4 2024: 6 jobsQ1 2025: 1 jobBusiest: 6 jobsLatest: 1 job2025
Each bar is 3 months of permits. The tallest is 6 jobs, October to December 2024. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981162 jobs
  • 981251 job
  • 981121 job
  • 981261 job
  • 981031 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Mar 21, 2025Panel upgradePanel change and adding a 20amp plug in living room98125$6,343
Dec 24, 2024Panel upgradeDoing a panel change, and adding new dedicated circuit for plugNot listed$6,069
Dec 19, 2024Panel upgradeExisting hot tub has wrong size wires ran from main panel to sub-panel98112$3,310
Dec 11, 2024Panel upgradeInstalling a panel change with the same 200amps panel just with more breaker slots, also wiring a…98116$6,069
Dec 11, 2024EV chargerInstalling a panel change with the same 200amps panel just with more breaker slots, also wiring a…98116$6,069
Oct 14, 2024Panel upgradeAdding new lights on 2nd floor rooms, hallway, living room  Adding new lights on 1st floor garage…98126$23,000
Oct 1, 2024Panel upgradeThis bathroom remodel will have 1) 20amp circuit for bathroom 2) 20amp circuit for bidet toilet 3)…98103$1,500

What to ask before you hire

About Formula 7 Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Formula 7 Electric LLC

Five quick questions. We pass your request to Formula 7 Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Formula 7 Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98116 and 98125

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.