contractors.fyi
Sign in

Garner Electric Washington LLC

EV charger installer based in Puyallup.

  • License active
  • Bond on file

25 jobs on Seattle permits, 2021 to 2025: 18 EV charger installations, 7 panel upgrades. 37th most EV charger permits of 148 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License GARNEEW864KB, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record25 jobs on Seattle permits, 2021 to 2025: 18 EV charger installations, 7 panel upgradesThey are based in Puyallup. Work outside Seattle is not in these records.37th most EV charger permits of 148 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.Of their 18 EV charger permits, 1 mention a panel upgrade.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $1,735 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What EV charger jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a EV charger permit stays open about 19 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long EV charger jobs take.

Track record

7 jobs in the last 12 months, up from 5 the year before

Q4 2021: 2 jobsQ3 2022: 4 jobsQ4 2022: 1 jobQ2 2023: 1 jobQ4 2023: 2 jobsQ1 2024: 2 jobsQ3 2024: 1 jobQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 3 jobsQ4 2025: 7 jobsBusiest: 7 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 7 jobs, October to December 2025. Across Seattle, all contractors together had 77% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981445 jobs
  • 981185 jobs
  • 981162 jobs
  • 981152 jobs
  • 981051 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Dec 9, 2025EV charger50amp EV charger circuit98105$1,425
Nov 18, 2025EV chargerInstall 60amp hardwired car charger circuit98107$1,740
Nov 12, 2025Panel upgradeHardwired 60amp charger 10' from the panel98116$1,000
Nov 5, 2025EV chargerHardwired 60amp EV circuit98117$1,730
Nov 5, 2025EV chargerHardwired 60amp EV circuit98144$1,190
Oct 15, 2025EV chargerEV Charger hardwired98125$2,435
Oct 15, 2025EV chargerEV Hardwired charger98108$3,347
Aug 6, 2025EV charger60amp hard wired Ford EV Charger98146$1,390
Jul 11, 2025EV chargerAdd alter 1 circuit 60 amp EV charger98178$1,500
Jul 2, 2025EV chargerInstall 50amp EV recepltacle98118$1,905
May 6, 2025EV charger60a Rivian EV install [C.Kenefick 5/14/2025 - fee for 60a EV charger added to permit98103$1,930
Feb 19, 2025Panel upgradeWire New Home[6/30/2025 JBC Changed Service from 200amp to 320amp Service]98115$31,071
Aug 26, 2024EV charger60 amp EVSE installation98119$1,604
Mar 6, 2024Panel upgradeWire new home [6/27/2024 PGF Removed 200A service fee and added (1) 399A service (to cover two 200A…98115$41,830
Jan 16, 2024EV charger240V circuit for EV charger: stall #2598144$1,500
Oct 25, 2023EV charger (×2, same day)40A Circuit for EV charger98144$2,007 each
May 19, 2023EV chargerNo details on the permit98144not stated
Nov 15, 2022EV chargerAdd 50A 240V circuit and hardwire for EV charger98118$1,200
Sep 29, 2022Panel upgradeAdding a 100-amp house meter and panel to an existing service98118$2,811
Aug 9, 2022Panel upgrade60a subpanel and 240v car charger98118$3,000
Aug 9, 2022Panel upgradeAdd 20a 120v circuit below panel98112$1,000
Aug 9, 2022EV charger60a subpanel and 240v car charger98118$3,000
Dec 17, 2021Panel upgradeAdd 60a subpanel - Add 20a 120v circuit for dishwasher98116$1,600
Dec 8, 2021EV chargerEV Charger Install98126not stated

What to ask before you hire

About Garner Electric Washington LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Garner Electric Washington LLC

Five quick questions. We pass your request to Garner Electric Washington LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Garner Electric Washington LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 98144 and 98118

See all 148 EV charger installers in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.