contractors.fyi
Sign in

Mauna Electric LLC

Panel upgrade electrician based in Bonney Lake.

  • License active
  • Bond on file

10 panel upgrade jobs on Seattle permits, 2022 to 2025. 159th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License MAUNAEL809CJ, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record10 panel upgrade jobs on Seattle permits, 2022 to 2025Every permit we have for them is panel upgrade.They are based in Bonney Lake. Work outside Seattle is not in these records.159th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $6,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $8,000 (3 permits, a small sample). What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q3 2022: 1 jobQ4 2022: 1 jobQ1 2023: 1 jobQ2 2023: 1 jobQ1 2024: 1 jobQ2 2024: 4 jobsQ3 2025: 1 jobBusiest: 4 jobs202320242025
Each bar is 3 months of permits. The tallest is 4 jobs, April to June 2024.

Where they work most

  • 981152 jobs
  • 981252 jobs
  • 981121 job
  • 981991 job
  • 981331 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 22, 2025Panel upgradePanel replacement, Service relocation and upgrade98115$2,500
Jun 27, 2024Panel upgradeThird floor remodel, 60A sub panel, main floor lighting98112$20,000
Jun 3, 2024Panel upgrade200A panel replacement98199$2,000
May 6, 2024Panel upgradeKitchen remodel and panel replacement98133$8,000
Apr 30, 2024Panel upgradeKitchen remodel & panel upgrade98109$8,000
Feb 12, 2024Panel upgradeUpgrading a 125A service to a 320A split and installing two 200A panels98125$5,000
Jun 2, 2023Panel upgradeRoute a 30A circuit from the panel to the water heater98115not stated
Jan 10, 2023Panel upgradePanel upgrade98103$1,000
Nov 5, 2022Panel upgradeFirst floor remodel. Rewire upstairs, replacing ungrounded cables with NMB. Panel relocation98136$10,000
Aug 9, 2022Panel upgradeKitchen and basement Bathroom remodel98125$6,000

What to ask before you hire

About Mauna Electric LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Mauna Electric LLC

Five quick questions. We pass your request to Mauna Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Mauna Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98115 and 98125

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.