Midpoint Const & Electric LLC
Panel upgrade electrician based in Bothell.
- License MIDPOCE864UK, expired in the state's records on Oct 3, 2026
- No current bond on the state's list for this license
14 jobs on Seattle permits, 2021 to 2024: 11 panel upgrades, 3 EV charger installations.
The state showed this license as "expired" on Oct 3, 2026. Do not hire until that is cleared.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License MIDPOCE864UK, expired in the state's records on Oct 3, 2026GENERAL | Problem |
| Insurance and bond? | No current bond on the state's list for this licenseNo liability insurance policy on the state's list for this license. | Ask them |
| Jobs on record | 14 jobs on Seattle permits, 2021 to 2024: 11 panel upgrades, 3 EV charger installationsThey are based in Bothell. Work outside Seattle is not in these records.Our Seattle permit records cover October 2021 to September 2026. |
Records: the state Department of Labor and Industries and City of Seattle permits.
Cost and timing
All panel upgrade jobs in Seattle: $4,000 to $13,000
Half of 9,831 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Seattle: $4,800 to $15,000 (6,233 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $7,500 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.
Get 2 or 3 written quotes.
Permit timeline
Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.
Track record
Jobs per quarter
Where they work most
- 981033 jobs
- 981172 jobs
- 981152 jobs
- 981332 jobs
- 981992 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Aug 5, 2024 | Panel upgradeBedroom, bathroom, laundry room alterations; 100A subpanel, power for driveway gate; 1/30/25 RN… | 98117 | $29,000 |
| Jul 25, 2023 | Panel upgrade90A subpanel and feeder for HVAC equipment; 3 branch circuits for HVAC | 98115 | $7,500 |
| May 3, 2023 | Panel upgradeInstall overhead 320 meter main for existing 200A panel and new 200A panel in DADU with new… | 98103 | $22,000 |
| Apr 19, 2023 | Panel upgradeUpgrade service and panel from 100A to 200A; Relocate panel; Install NEMA 14-50 for EV charging;… | 98133 | $9,500 |
| Apr 19, 2023 | EV chargerUpgrade service and panel from 100A to 200A; Relocate panel; Install NEMA 14-50 for EV charging;… | 98133 | $9,500 |
| Dec 21, 2022 | EV chargerNo details on the permit | 98115 | $2,400 |
| Dec 15, 2022 | Panel upgradeAdd 90A subpanel and new circuits for 2nd floor remodel | 98105 | $8,000 |
| Sep 15, 2022 | Panel upgradeAddition of 2nd floor with 3 new bedrooms, 2 baths and office; re-work circuits and lighting main… | 98103 | $46,000 |
| Sep 12, 2022 | Panel upgradeUpgrade existing 125A panel from 12-space to 20-space panel; relocate hot water tank circuit from… | 98199 | $2,100 |
| Jul 10, 2022 | Panel upgradeUpgrade existing 12-space panel to 20-space; relocate hot water tank circuit, add washer and dryer… | 98199 | $2,600 |
| Jul 6, 2022 | Panel upgradeReplace existing Zinsco125A panel with Square D Homeline panel | 98117 | $2,150 |
| Apr 16, 2022 | Panel upgradeModify existing 400A service | 98118 | $2,500 |
| Dec 12, 2021 | Panel upgradeInstall 12-circuit 60A main subpanel for garage addition with grounding to UFER ground in garage… | 98103 | $7,000 |
| Nov 10, 2021 | EV chargerInstall simpleSwitch and NEMA 14-50 charging receptacle for EV charger | 98109 | $3,400 |
What to ask before you hire
About Midpoint Const & Electric LLC
- Do not hire until the state shows the license as active.
- Ask for proof of liability insurance and a current bond.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Midpoint Const & Electric LLC
Five quick questions. We pass your request to Midpoint Const & Electric LLC.
Request for Midpoint Const & Electric LLC
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Midpoint Const & Electric LLC. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 98103 and 98117
- As You Wish Electric
- Kemly Electric, Inc
- Eco Electric & Plumbing
- Town Electric, Plumbing & Heating LLC
- Aim Electric LLC
- Chris Schatz Electric
See all 327 panel upgrade electricians in Seattle, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.