contractors.fyi
Sign in

Nw Electrical LLC

Panel upgrade electrician based in Auburn.

  • License active
  • Bond on file

13 jobs on Seattle permits, 2021 to 2025: 12 panel upgrades, 1 EV charger installation. 140th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License NWELEEL886NP, active in the state's records on Oct 3, 2026Electrical contractor, residential specialtyChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record13 jobs on Seattle permits, 2021 to 2025: 12 panel upgrades, 1 EV charger installationThey are based in Auburn. Work outside Seattle is not in these records.140th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $5,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 1 jobQ1 2022: 2 jobsQ3 2022: 2 jobsQ2 2023: 1 jobQ3 2023: 1 jobQ2 2024: 1 jobQ4 2024: 4 jobsQ3 2025: 1 jobBusiest: 4 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2024.

Where they work most

  • 981154 jobs
  • 981253 jobs
  • 981173 jobs
  • 981462 jobs
  • 981121 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 24, 2025Panel upgrade3pack 300amp service with 125amp feeder to each unit98125not stated
Dec 9, 2024Panel upgradeIsolate all circuits and install 2 temp circuits under panel [C.Kenefick 2/10/2025 - fee for SCL…98125$1,000
Dec 6, 2024Panel upgradeUpgrade service to 200amp98117$5,000
Dec 6, 2024EV chargerUpgrade service to 200amp98117$5,000
Nov 11, 2024Panel upgradeWiring of kitchenette and relocate 200amp electrical panel98115$5,000
May 14, 2024Panel upgrade, 2000 sq ftRewire of 2000sq ft SFR with 200amp service98125not stated
Jul 24, 2023Panel upgradeRough in of SFR and AADU.[12/19/2023 JBC Added 400amp Service and 125amp Feeder . Credited 125amp…98112not stated
Jun 1, 2023Panel upgradeNew wiring for garage with 50amp sub panel98117not stated
Aug 23, 2022Panel upgrade, 774 sq ftRough in of DADU 774sq ft with 125amp service98146not stated
Aug 23, 2022Panel upgrade, 612 sq ftRough in of AADU 612sq ft with 125amp service98146not stated
Feb 12, 2022Panel upgradeRewire of main floor and second floor98115not stated
Jan 27, 2022Panel upgrade, 4650 sq ftRough in of 4 row houses98115$28,000
Nov 22, 2021Panel upgrade, 3200 sq ftRough in of duplex row houses98115not stated

What to ask before you hire

About Nw Electrical LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Nw Electrical LLC

Five quick questions. We pass your request to Nw Electrical LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Nw Electrical LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98115 and 98125

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.