contractors.fyi
Sign in

Power Electric

Panel upgrade electrician based in Everett.

  • License active
  • Bond on file

15 jobs on Seattle permits, 2022 to 2024: 12 panel upgrades, 3 EV charger installations. 141st most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License POWERE*991O5, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record15 jobs on Seattle permits, 2022 to 2024: 12 panel upgrades, 3 EV charger installationsThey are based in Everett. Work outside Seattle is not in these records.141st most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $22,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2022: 2 jobsQ2 2022: 2 jobsQ3 2022: 3 jobsQ1 2023: 1 jobQ3 2023: 2 jobsQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 2 jobsQ4 2024: 1 jobBusiest: 3 jobsLatest: 1 job202220232024
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2022.

Where they work most

  • 981121 job
  • 981331 job
  • 981031 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 11, 2024Panel upgradeMaster bed/bath and 2nd bathroom remodel98112$25,000
Jul 31, 2024Panel upgradeUnits 101, 102, and 103 changing panels, devices, and adding 4 circuits[8/9/2024 Ok Feeder Fees the…98133$25,000
Jul 16, 2024Panel upgradeUNITS- 302, 303, 401, and 403. Panel change, change all devices, run 1 new circuit, run 2 home runs…Not listed$40,000
May 9, 2024Panel upgradeChange recalled Zinsco panels in UNITS 201, 202, 203 ,and 301 and update other electrical…Not listed$30,000
Jan 18, 2024Panel upgradePanel change, kitchen, and 2nd floor remodel98103$20,000
Aug 2, 2023Panel upgradeService upgrade to 200 amps, relocate meter, panel change, and electric car chargerNot listed$8,000
Aug 2, 2023EV chargerService upgrade to 200 amps, relocate meter, panel change, and electric car chargerNot listed$8,000
Feb 9, 2023Panel upgradeWhole house remodelNot listed$25,000
Aug 9, 2022Panel upgradeService upgrade from 100 amp to 200 ampNot listed$15,000
Aug 9, 2022EV chargerService upgrade from 100 amp to 200 ampNot listed$15,000
Jul 20, 2022Panel upgradeService upgrade from 100 to 200 ampNot listed$10,000
Jun 7, 2022EV chargerInstalling 50 amp 240v EV outlet and 20 amp 120v weather proof outlet outside next to meterNot listed$1,500
Apr 5, 2022Panel upgradeDemo knob and tube wiring and rewire main floor and 2nd floorNot listed$28,000
Jan 24, 2022Panel upgrade200 amp Panel and meter changeNot listed$3,500
Jan 10, 2022Panel upgradeBasement remodel and panel change/upgradeNot listed$18,000

What to ask before you hire

About Power Electric

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Power Electric

Five quick questions. We pass your request to Power Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Power Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98112 and 98133

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.