contractors.fyi
Sign in

Power Fix LLC

Panel upgrade electrician based in Kent.

  • License active
  • Bond on file

10 jobs on Seattle permits, 2022 to 2025: 6 panel upgrades, 3 EV charger installations, 1 solar installation. 221st most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License POWERFL842RG, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record10 jobs on Seattle permits, 2022 to 2025: 6 panel upgrades, 3 EV charger installations, 1 solar installationThey are based in Kent. Work outside Seattle is not in these records.221st most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $13,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

1 job in the last 12 months, down from 5 the year before

Q3 2022: 1 jobQ1 2024: 3 jobsQ4 2024: 1 jobQ1 2025: 3 jobsQ3 2025: 1 jobQ4 2025: 1 jobBusiest: 3 jobsLatest: 1 job202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2024. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981063 jobs
  • 981192 jobs
  • 981081 job
  • 981071 job
  • 981051 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 9, 2025Panel upgradeInstall subpanelNot listed$22,600
Jul 23, 2025EV chargerInstall circuit for mini split system and garage EV receptacle98119$3,000
Feb 16, 2025Panel upgradeInstall [2] 40A 208V circuits to supply receptacle panel98108$2,500
Jan 10, 2025Panel upgradeInstall 125A feeder and sub panel, 50A EV receptacle, 120V 20A exterior GFCI receptacle, and [2]…98106$4,000
Jan 10, 2025EV chargerInstall 125A feeder and sub panel, 50A EV receptacle, 120V 20A exterior GFCI receptacle, and [2]…98106$4,000
Oct 6, 2024EV chargerInstall EV charger in garage98106$1,400
Mar 21, 2024Panel upgradeInstall 100A sub panel and new branch circuits to re-feed existing outlets in basement and West…98119$15,000
Feb 13, 2024Panel upgradeReplace [10] panels in apartment units98107$25,000
Jan 26, 2024SolarResidential Enphase Solar System98105$5,000
Jul 29, 2022Panel upgradeNew sub panel and circuits for basement ADU98177$12,000

What to ask before you hire

About Power Fix LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Power Fix LLC

Five quick questions. We pass your request to Power Fix LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Power Fix LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98106 and 98119

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.