contractors.fyi
Sign in

Pride Electric, Inc

Panel upgrade electrician based in Redmond.

  • License PRIDEEI077DR, expired in the state's records on Oct 3, 2026
  • No current bond on the state's list for this license

4 panel upgrade jobs on Seattle permits, 2022 to 2024.

The state showed this license as "expired" on Oct 3, 2026. Do not hire until that is cleared.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License PRIDEEI077DR, expired in the state's records on Oct 3, 2026GENERALProblem
Insurance and bond?No current bond on the state's list for this licenseNo liability insurance policy on the state's list for this license.Ask them
Jobs on record4 panel upgrade jobs on Seattle permits, 2022 to 2024Every permit we have for them is panel upgrade.They are based in Redmond. Work outside Seattle is not in these records.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,550 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Where they work most

  • 981211 job
  • 981261 job
  • 981161 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
May 3, 2024Panel upgradeReplace house panel with larger frame size98121$6,500
Dec 11, 2023Panel upgradeShorten and terminate service entrance conductors due to the wires are pushing on the panel cover…98126not stated
Sep 13, 2022Panel upgradeReplace existing 200 amp service with new including meter disconnect and new panelNot listed$2,450
Jan 20, 2022Panel upgradeUpgrade the existing service from 200 to 320amp98116$2,550

What to ask before you hire

About Pride Electric, Inc

  • Do not hire until the state shows the license as active.
  • Ask for proof of liability insurance and a current bond.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Pride Electric, Inc

Five quick questions. We pass your request to Pride Electric, Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Pride Electric, Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98121 and 98126

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.