contractors.fyi
Sign in

Puget Electric LLC

Panel upgrade electrician based in Redmond.

  • License active
  • Bond on file

17 jobs on Seattle permits, 2022 to 2025: 15 panel upgrades, 2 EV charger installations. 113th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License PUGETEL812JD, active in the state's records on Oct 3, 2026Electrical contractorChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record17 jobs on Seattle permits, 2022 to 2025: 15 panel upgrades, 2 EV charger installationsThey are based in Redmond. Work outside Seattle is not in these records.113th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $7,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2022: 1 jobQ2 2022: 3 jobsQ2 2023: 3 jobsQ3 2023: 2 jobsQ4 2023: 1 jobQ2 2024: 2 jobsQ3 2024: 1 jobQ1 2025: 3 jobsQ3 2025: 1 jobBusiest: 3 jobsBusiest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2022.

Where they work most

  • 981054 jobs
  • 981183 jobs
  • 981152 jobs
  • 981032 jobs
  • 981162 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 23, 2025Panel upgradeService upgrade to 400 A (320A) [CJK 11/7/2025 - 125a feeder for generator added to permit.]98115$10,000
Jan 27, 2025Panel upgradeRewire 3 floor 4 bedroom house up to basic code requirements with 400A single phase service and 2…98103$50,000
Jan 27, 2025EV chargerRewire 3 floor 4 bedroom house up to basic code requirements with 400A single phase service and 2…98103$50,000
Jan 16, 2025Panel upgrade125 A like to like panel replacement98119$2,000
Sep 23, 2024Panel upgradeReplacement of 200 A main panel, adding 4 new circuits98105$5,000
Jun 25, 2024Panel upgrade100 A service update, new panel, rewiring of unit after severe water damage98125$7,700
Apr 10, 2024Panel upgrade2 spider box whip installation in two panels, disconnecting all other circuits98116$1,300
Oct 2, 2023Panel upgradeElectrical room on floor 5 and media room on floor 6 have water damage fro roof leak98133$8,000
Aug 25, 2023Panel upgradeBasic kitchen rewiring, 200 AMP main panel replacement98105$20,000
Jul 7, 2023Panel upgradeReplacement of panel, 2x 20A outlets for temp power98112$1,100
May 3, 2023Panel upgradeNew 400 AMP service, 1x 200 amp and 1x 100 amp panel98105$7,000
May 2, 2023Panel upgrade50 A car charger circuit, replacement of 200 A panel, 20A bathroom floor heat circuit, outlet…98118$8,000
May 2, 2023EV charger50 A car charger circuit, replacement of 200 A panel, 20A bathroom floor heat circuit, outlet…98118$8,000
Jun 22, 2022Panel upgradeNew 200 AMP service98118$5,000
Jun 13, 2022Panel upgradeReplacement of main panel98105$3,200
May 17, 2022Panel upgrade50A hot tub circuit, Circuit with 1x outlet outside, 1x outlet inside, 1x switch and 1x light,…98116$8,897
Mar 21, 2022Panel upgradeNo details on the permit98115$3,900

What to ask before you hire

About Puget Electric LLC

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Puget Electric LLC

Five quick questions. We pass your request to Puget Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Puget Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98105 and 98118

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.