contractors.fyi
Sign in

Purelight Power

Solar installer working in Seattle.

  • Seattle publishes no contractor license list we can check

439 jobs on Seattle permits, 2021 to 2025: 424 solar installations, 14 panel upgrades, 1 EV charger installation.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Seattle publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record439 jobs on Seattle permits, 2021 to 2025: 424 solar installations, 14 panel upgrades, 1 EV charger installationOur Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $6,046 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What solar system jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a solar system permit stays open about 43 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long solar system jobs take.

Track record

11 jobs in the last 12 months, down from 29 the year before

Q4 2021: 27 jobsQ1 2022: 31 jobsQ2 2022: 71 jobsQ3 2022: 72 jobsQ4 2022: 65 jobsQ1 2023: 45 jobsQ2 2023: 29 jobsQ3 2023: 13 jobsQ4 2023: 19 jobsQ1 2024: 17 jobsQ2 2024: 5 jobsQ3 2024: 5 jobsQ4 2024: 7 jobsQ1 2025: 4 jobsQ2 2025: 3 jobsQ3 2025: 15 jobsQ4 2025: 11 jobsBusiest: 72 jobsLatest: 11 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 72 jobs, July to September 2022. Across Seattle, all contractors together had 68% fewer solar system jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9811858 jobs
  • 9810643 jobs
  • 9811739 jobs
  • 9812635 jobs
  • 9811629 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 29, 2025SolarRemoving and reinstalling solar system for homeowners new roof to be installed98188$2,400
Oct 23, 2025SolarRepairing solar panels that are not producing power98116not stated
Oct 17, 2025Solar, 3.440 kWPhotovoltaic pitched roof mounted system3.440 kw dc 3.3kw ac98125$29,367
Oct 17, 2025Solar, 6.160 kWPhotovoltaic pitched roof mounted system6.160 kw /4.480 kw ac98126$42,763
Oct 14, 2025SolarRepairing solar system string down issue.; 11/7/25 RN This was a Micro Inverter issue (loose…98108not stated
Oct 7, 2025Solar, 4.840 kW98122$14,387
Oct 6, 2025SolarRemoving 12 solar panels so homeowner can have new roof installed98116$1,200
Oct 6, 2025SolarInstalling critter guard on the perimeter of the solar system on the roof98116$2,094
Oct 2, 2025Solar, 15.840 kW98116$4,600
Oct 2, 2025Solar, 13.200 kW98115$34,781
Oct 1, 2025Solar, 9.240 kWPHOTOVOLTAIC PITCHED ROOF MOUNTED SYSTEM9.240 KW DC/6.720 KW AC [C.Kenefick 1/20/2026 - contractor…98125$23,839
Sep 30, 2025Solar, 10.12 kWPV roof mounted system and energy storage 10.12 kw DC 7.36kw AC 15KWH 2 circuits [9/16/2025 BGO -…98199$44,966
Sep 29, 2025Solar, 10.32 kWPV roof mounted system and energy storage 10.32kw DC 9.96kw AC 30KWH [9/29/25 BGO - Approved PV+ESS…Not listed$68,335
Sep 22, 2025Solar, 5.590 kW98115$45,984
Sep 12, 2025Solar, 3.780 kWNew photovoltaic pitched roof mounted system3.780 kw dc/3.680 kw ac98126$21,218
Sep 8, 2025Solar, 5.72 kW98115$14,758
Sep 8, 2025SolarRemoving and reinstalling 8 solar panels for homeowners new roof to be installed98107$1,200
Sep 5, 2025SolarRemoval and reinstall of solar system for homewonwers new roof to be installed98118$4,200
Sep 4, 2025Solar, 3.44 kW98106$16,691
Aug 29, 2025Solar, 4.84 kW98115$14,387
Aug 28, 2025Solar, 15.4 kWPV roof mounted system 15.4kw DC 11.2kw AC 3 circuits [8-28-25 DR - Plan review waved, permit…98116$4,600
Aug 11, 2025Solar, 3.52 kW98107$9,596
Aug 7, 2025Solar, 3.87 kW98103$17,172
Aug 1, 2025SolarNo details on the permit98105$6,600
Jul 18, 2025Solar, 6.600 kWNew PV Solar Roof Mounted System 6.600kW98108$24,220
Jul 11, 2025SolarPv solar roof mount installation 7.92098133$28,550
Jun 16, 2025Solar, 3.690 kWPV solar roof mount installation, 1 circuit, 3.690 KW DC98118$16,786
May 30, 2025EV chargerEV chager outlet - 50 amps98106not stated
May 8, 2025Solar, 5.280 kWPV solar roof mount installation, 1 string, 5.280 KW DC/3.800 KW AC98106$21,792
Mar 6, 2025Solar, 4.920 kWNot listed$19,743
Mar 4, 2025Solar, 4.920 kWAdditional PV Solar Roof Mount Installation 4.920kW98106$20,664
Feb 18, 2025Solar, 8.610 kWPV solar roof mount installation, 8.610 KW DC/5.700 KW AC98116$36,180
Jan 22, 2025Panel upgradeMain Meter Upgrade and Main Panel Upgrade98115$26,556
Dec 31, 2024Solar, 6.560 kWPV solar roof mount installation, 1 circuit, 6.560kW, main panel upgrade98118$26,556
Dec 30, 2024Solar, 7.380 kW98178$46,628
Dec 20, 2024Solar, 11.480 kWPV Solar Roof Mount Installation 11.480kW, 2 Circuits [12-20-24 DR - Fee adjusted, inspector to…98178$2,200
Nov 12, 2024Solar98103$26,994
Nov 12, 2024Solar, 6.970 kW98112$29,274
Nov 6, 2024Solar98126$26,410
Oct 31, 2024Solar98103$25,830

What to ask before you hire

About Purelight Power

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Purelight Power

Five quick questions. We pass your request to Purelight Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Purelight Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 98118 and 98106

See all 33 solar installers in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.