contractors.fyi
Sign in

Queen Anne Electric LLC

Panel upgrade electrician based in Seattle.

  • License active
  • No current bond on the state's list for this license

93 jobs on Seattle permits, 2021 to 2026: 77 panel upgrades, 15 EV charger installations, 1 solar installation. 17th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License QUEENAE914LK, active in the state's records on Oct 3, 2026GENERALChecks out
Insurance and bond?No current bond on the state's list for this licenseNo liability insurance policy on the state's list for this license.Ask them
Jobs on record93 jobs on Seattle permits, 2021 to 2026: 77 panel upgrades, 15 EV charger installations, 1 solar installation17th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $11,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $21,000 (4 permits, a small sample). What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

8 jobs in the last 12 months, down from 25 the year before

Q4 2021: 3 jobsQ1 2022: 6 jobsQ2 2022: 6 jobsQ3 2022: 6 jobsQ4 2022: 4 jobsQ1 2023: 7 jobsQ2 2023: 1 jobQ3 2023: 3 jobsQ4 2023: 2 jobsQ1 2024: 4 jobsQ2 2024: 9 jobsQ3 2024: 9 jobsQ4 2024: 9 jobsQ1 2025: 9 jobsQ2 2025: 3 jobsQ3 2025: 4 jobsQ4 2025: 6 jobsQ1 2026: 1 jobQ3 2026: 1 jobBusiest: 9 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 9 jobs, April to June 2024. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981034 jobs
  • 981193 jobs
  • 981022 jobs
  • 981152 jobs
  • 981211 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 3, 2026Panel upgrade, 10 kWInstalling a new 200 amp Ecoflow Ocean smart panel in same location was existing 200 amp panel tied…Not listed$19,995
Jan 15, 2026Panel upgradeInstalling an Ecoflow smart panel and batter back up system [1/15/26 BGO - Approved ESS Plan Set]Not listed$3,500
Dec 18, 2025Panel upgradeSubpanel Misc rewiring of k+t Updating cosmetic work around the home adding lights and miscNot listed$34,000
Dec 9, 2025Panel upgrade200 amp service and rewiring remaining knob and tube in homeNot listed$30,000
Nov 19, 2025Panel upgrade200amp service and 4 outletsNot listed$10,000
Nov 17, 2025Panel upgradeUnit 3 Panel swapNot listed$3,500
Oct 31, 2025SolarNo details on the permitNot listed$50,000
Oct 27, 2025Panel upgradeEmergency 200 amp service repair after tree fallNot listed$3,500
Aug 11, 2025EV chargerNew EV chargerNot listed$3,500
Jul 30, 2025EV chargerNew car charger Adding 2 outlets 2 cans Swapping some dimmers98121$4,000
Jul 8, 2025Panel upgrade200 amp service and whole house remodelNot listed$40,000
Jul 2, 2025Panel upgradeNew 200amp service Rewiring remaining knob and tube Adding misc new outletsNot listed$23,000
May 28, 2025Panel upgradeSubpanel and 2 120v circuits, installing dual function breakers on existing wiring98119$6,700
May 21, 2025Panel upgradeCondo remodelNot listed$27,000
Apr 22, 2025Panel upgradeEmergency 200 amp service to repair rusted out existingNot listed$4,000
Mar 26, 2025Panel upgradeNo details on the permitNot listed$3,800
Mar 19, 2025Panel upgradeNot listed$11,000
Mar 4, 2025EV charger60amp car chargerNot listed$2,000
Feb 27, 2025Panel upgrade100 amp Sub panel run to the garage underground to serve front yard and garage work -Installing…Not listed$6,000
Feb 27, 2025EV charger100 amp Sub panel run to the garage underground to serve front yard and garage work -Installing…Not listed$6,000
Feb 21, 2025Panel upgradeMisc knob and tube, remodel work, subpanel addition98133$26,800
Jan 23, 2025EV charger50a car chargerNot listed$1,700
Jan 22, 2025EV chargerKnob and tube rewiring added car chargerNot listed$13,000
Jan 5, 2025Panel upgradeKitchen, living, bathroom, study & laundry remodel New subpanel Rewire of some main floor knob and…Not listed$27,000
Dec 18, 2024Panel upgradeNo details on the permit98102$4,000
Dec 3, 2024Panel upgrade200amp service Misc remodel work in kitchenNot listed$29,000
Nov 26, 2024EV chargerCar charger and sump pump circuit and adding 4 outletsNot listed$4,500
Nov 22, 2024Panel upgradeNew garage[3/7/2025 JBC Added 90amp Garage Feeder Panel to permit]Not listed$10,000
Nov 19, 2024EV chargerNo details on the permitNot listed$3,500
Nov 18, 2024Panel upgradeNew subpanelNot listed$1,100
Nov 8, 2024Panel upgradeInstalling a new underground 320 Amp service with Seattle City LightNot listed$25,000
Oct 24, 2024Panel upgradeNew 200 amp serviceNot listed$11,000
Oct 2, 2024Panel upgrade200amp panel swapNot listed$4,000
Sep 18, 2024EV chargerMostly whole house remodel, adding car charger, heat pump, outdoor heatersNot listed$58,000
Sep 3, 2024Panel upgradeNot listed$8,000
Aug 15, 2024Panel upgrade200 amp service and car chargerNot listed$11,500
Aug 15, 2024EV charger200 amp service and car chargerNot listed$11,500
Aug 14, 2024Panel upgradeBasement remodel and 200 amp serviceNot listed$22,000
Aug 1, 2024Panel upgradeReplacing old Federal Pacific service gear in an apartment complex98103$40,000
Jul 30, 2024EV chargerCar charger, rewiring a few outlets, adding surge protectorNot listed$5,000

What to ask before you hire

About Queen Anne Electric LLC

  • Ask for proof of liability insurance and a current bond.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Queen Anne Electric LLC

Five quick questions. We pass your request to Queen Anne Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Queen Anne Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98103 and 98119

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.