Sd Electrical Services LLC
Panel upgrade electrician based in Seattle.
- License active
- Bond on file
22 jobs on Seattle permits, 2022 to 2025: 20 panel upgrades, 2 EV charger installations. 83rd most panel upgrade permits of 327 contractors in Seattle.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License SDELEES781CA, active in the state's records on Oct 3, 2026Electrical contractor | Checks out |
| Insurance and bond? | Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate. | Bond on file |
| Jobs on record | 22 jobs on Seattle permits, 2022 to 2025: 20 panel upgrades, 2 EV charger installations83rd most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026. |
Records: the state Department of Labor and Industries and City of Seattle permits.
Cost and timing
All panel upgrade jobs in Seattle: $4,000 to $13,000
Half of 9,831 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Seattle: $4,800 to $15,000 (6,233 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $9,000 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.
Get 2 or 3 written quotes.
Permit timeline
Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.
Track record
Jobs per quarter
Where they work most
- 981086 jobs
- 981253 jobs
- 981222 jobs
- 981152 jobs
- 981182 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Apr 2, 2025 | Panel upgradeRelocate service meter to new designated location and flip circuit panel to be an exterior rated… | Not listed | $5,000 |
| Mar 31, 2025 | Panel upgradeService Panel Upgrade: Upgrade service panel and service meter to accommodate 200A for the SFR… | Not listed | $7,000 |
| Jan 23, 2025 | Panel upgrade, 991 sq ftService meter and electrical wiring of a 991 Sq | 98125 | $12,000 |
| Dec 27, 2024 | Panel upgradeRelocation of 200 AMP service meter to the N side of the Building | 98122 | $3,000 |
| Dec 27, 2024 | Panel upgradeRemoving existing UG service | 98125 | $20,000 |
| Feb 21, 2024 | Panel upgradeSmall kitchen renovation 3/5/24 Bob Schumacher was told a new panel was installed | 98122 | $4,500 |
| Feb 21, 2024 | Panel upgradeNo details on the permit | 98107 | $8,000 |
| Jan 18, 2024 | EV chargerInstallation of a 50 AMP receptacle for EV plug in charger | 98126 | not stated |
| Dec 13, 2023 | Panel upgradeReplacing existing 200 AMP panel/meter with new | 98125 | $2,000 |
| Oct 6, 2023 | Panel upgradeRelocation of the service panel and upgrade of feeder | 98115 | $4,000 |
| Aug 15, 2023 | Panel upgrade, 500 sq ftElectrical installation to the 500 sq | Not listed | $8,000 |
| Jul 24, 2023 | Panel upgradeInstallation of a 100 AMP subpanel, along with a 120V/50AMP Receptacle | Not listed | $2,500 |
| Jun 16, 2023 | EV chargerAdding the following: electrical wiring for a mini-split, EV Charging receptacle, and several… | 98118 | $4,000 |
| Apr 13, 2023 | Panel upgradeSwapping the zinsco panel for an updated panel | 98118 | $3,500 |
| Mar 29, 2023 | Panel upgrade (×3, same day) | 98108 | $10,000 each |
| Mar 24, 2023 | Panel upgrade (×3, same day)No details on the permit | 98108 | $10,000 each |
| Sep 14, 2022 | Panel upgradeBottom floor electrical remodel w/ a request of service upgrade to 200AMP | 98103 | $10,000 |
| Jul 22, 2022 | Panel upgradeService Upgrade (200 AMP) with a Complete Remodel | 98115 | $20,000 |
What to ask before you hire
About Sd Electrical Services LLC
- Ask for a certificate of liability insurance.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Sd Electrical Services LLC
Five quick questions. We pass your request to Sd Electrical Services LLC.
Request for Sd Electrical Services LLC
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Sd Electrical Services LLC. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 98108 and 98125
- As You Wish Electric
- The Electric Company of Seattle
- 24/7 Electrical Company
- Nwelectricianstoday LLC
- Wire Craft Electric Inc
- Arial Electric Inc
See all 327 panel upgrade electricians in Seattle, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.