contractors.fyi
Sign in

Seattle Electrical LLC

Panel upgrade electrician based in Bellevue.

  • License SEATTEL774PP, expired in the state's records on Oct 3, 2026
  • No current bond on the state's list for this license

9 jobs on Seattle permits, 2024 to 2025: 8 panel upgrades, 1 EV charger installation.

The state showed this license as "expired" on Oct 3, 2026. Do not hire until that is cleared.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License SEATTEL774PP, expired in the state's records on Oct 3, 2026GENERALProblem
Insurance and bond?No current bond on the state's list for this licenseNo liability insurance policy on the state's list for this license.Ask them
Jobs on record9 jobs on Seattle permits, 2024 to 2025: 8 panel upgrades, 1 EV charger installationThey are based in Bellevue. Work outside Seattle is not in these records.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,450 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q2 2024: 3 jobsQ3 2024: 2 jobsQ4 2024: 1 jobQ2 2025: 2 jobsQ3 2025: 1 jobBusiest: 3 jobsLatest: 1 job2025
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2024.

Where they work most

  • 981152 jobs
  • 981052 jobs
  • 981071 job
  • 981031 job
  • 981021 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 11, 2025Panel upgradeProvide electrical  wiring, power, panel, lights, outlets, switches, A/C unit, appliances, and…98115$10,000
Jun 16, 2025Panel upgradeWe need an electrical inspector to visit the site to assess the existing power distribution panel…98107not stated
Apr 6, 2025EV chargerHood 120V 20A, Refrigerator 120V 20A, Oven 240V 50A, Kitchen receptacles 120V 20A -2, Car charger…98103$6,000
Oct 28, 2024Panel upgradeNo details on the permit98102$2,200
Jul 22, 2024Panel upgradeReplace Panel Provide one dedicated circuit for the floor heating [11/5/2024 PGF Removed…98117$1,200
Jul 15, 2024Panel upgradeRemove the main electrical panel during a seismic retrofit in the area98105$5,000
Jun 18, 2024Panel upgradeReplace the electrical panel[6/20/2024 JBC incorrect fee, credited Inspection Only fee and added…98115$2,450
May 28, 2024Panel upgradeReplace the Electrical Panel98105$2,500
Apr 19, 2024Panel upgradeReplace the electrical panel98116$1,200

What to ask before you hire

About Seattle Electrical LLC

  • Do not hire until the state shows the license as active.
  • Ask for proof of liability insurance and a current bond.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Seattle Electrical LLC

Five quick questions. We pass your request to Seattle Electrical LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Seattle Electrical LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98115 and 98105

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.