contractors.fyi
Sign in

Sound Power

Panel upgrade electrician based in Des Moines.

  • License active
  • Bond on file

23 jobs on Seattle permits, 2022 to 2025: 18 panel upgrades, 5 EV charger installations. 95th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License SOUNDPL840CS, active in the state's records on Oct 3, 2026Electrical contractor, residential specialtyChecks out
Insurance and bond?Bond $4,000 on file with the state, with no end date (it stays in force until the bond company cancels it)The state keeps no liability insurance records for electrical contractors, so ask for a certificate.Bond on file
Jobs on record23 jobs on Seattle permits, 2022 to 2025: 18 panel upgrades, 5 EV charger installationsThey are based in Des Moines. Work outside Seattle is not in these records.95th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $10,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $15,000 (5 permits, a small sample). What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 4 the year before

Q1 2022: 3 jobsQ2 2022: 1 jobQ4 2022: 1 jobQ1 2023: 2 jobsQ3 2023: 4 jobsQ4 2023: 2 jobsQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 2 jobsQ2 2025: 1 jobQ3 2025: 3 jobsQ4 2025: 2 jobsBusiest: 4 jobsLatest: 2 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 4 jobs, July to September 2023. Across Seattle, all contractors together had 74% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981362 jobs
  • 981462 jobs
  • 981182 jobs
  • 981262 jobs
  • 981252 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 12, 2025Panel upgrade200 amp exterior panel, refeed existing interior load center& converted for sub panel98136$3,000
Oct 10, 2025EV charger50 Amp EV charger- Disconnect located on west side of home98146$2,000
Sep 30, 2025EV chargerEV power- GFCI outlet installed at exterior of house (SE corner) Shedding device installed near…98112not stated
Sep 12, 2025EV chargerEV charger with disconnect at exterior of garage98117not stated
Jul 30, 2025Panel upgradeSingle family house rewire, main panel relocated to exterior- meter & mast aerial service to remain…98109$20,000
May 7, 2025Panel upgradePanel replacement, like in kind, same location 200 amp98199$4,000
Sep 10, 2024Panel upgradeElectrical service meter & panel replace with new meter main near existing location98146$10,000
Aug 15, 2024Panel upgradeMain floor remodel- Kitchen, living & bathrooms98118$25,000
Apr 8, 2024Panel upgradePanel replacement, recessed lighting, smarts switches, add dedicated circuits, network wiring98133$20,000
Jan 17, 2024Panel upgradeZinsco panel replacement, kitchen nook circuits added98126$5,000
Nov 1, 2023Panel upgradeElectrical service panel/ Meter, damage repair98107$7,000
Oct 5, 2023Panel upgradeFull home remodel [C.Kenefick 5/16/24 - Fees for dedicated appliance circuits and 100a feeder panel…98136$25,000
Aug 9, 2023Panel upgradeZinsco load center replaced with new at existing dwelling units98125$10,000
Aug 9, 2023Panel upgradeZinsco panel replaced of existing units & house panel, 100 amp dwelliing 3x98125$10,000
Jul 20, 2023Panel upgradeRelocated Electrical 200 amp service meter disconnect NW corner lot -New detached garage build with…98116$25,000
Jul 20, 2023EV chargerRelocated Electrical 200 amp service meter disconnect NW corner lot -New detached garage build with…98116$25,000
Jan 22, 2023Panel upgradeFull home remodel, new min 200-amp load center at garage with 100-amp panel on lower levelNot listed$35,000
Jan 3, 2023Panel upgradeMain panel replacement & grounding98177$5,000
Dec 12, 2022Panel upgradeMinor Remodel of Kitchen & Master bathroom Unit 502. Panel replacementNot listed$10,000
Apr 25, 2022Panel upgradeElectrical service upgrade 200 amp, hot tub locating installed98126$10,000
Mar 22, 2022Panel upgradeHome remodel, mostly open walls, rewire, electrical service panel [C.Kenefick 8/5/2026 - Renewal…98118$10,000
Mar 15, 2022EV chargerEV charging outletNot listed$1,000
Feb 8, 2022Panel upgradeKitchen remodel, lighting installations, 200 amp service upgradeNot listed$15,000

What to ask before you hire

About Sound Power

  • Ask for a certificate of liability insurance.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Sound Power

Five quick questions. We pass your request to Sound Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Sound Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98136 and 98146

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.