Unity Electric
Panel upgrade electrician working in Seattle.
- Seattle publishes no contractor license list we can check
11 jobs on Seattle permits, 2022 to 2025: 8 panel upgrades, 2 EV charger installations, 1 solar installation.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Seattle publishes no contractor license list we can checkThat says nothing about this business either way. | Ask them |
| Jobs on record | 11 jobs on Seattle permits, 2022 to 2025: 8 panel upgrades, 2 EV charger installations, 1 solar installationOur Seattle permit records cover October 2021 to September 2026. |
Records: the state Department of Labor and Industries and City of Seattle permits.
Cost and timing
All panel upgrade jobs in Seattle: $4,000 to $13,000
Half of 9,831 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Seattle: $4,800 to $15,000 (6,233 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $16,000 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.
Get 2 or 3 written quotes.
Permit timeline
Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.
Track record
4 jobs in the last 12 months, up from 2 the year before
Where they work most
- 981254 jobs
- 981021 job
- 981181 job
- 981051 job
- 981041 job
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Dec 30, 2025 | Panel upgradeConvert existing outlet to a 30a receptacle | 98125 | not stated |
| Nov 17, 2025 | EV chargerRelocate existing car charger on l1 to p1 space 9 | 98102 | not stated |
| Oct 28, 2025 | Panel upgradeReplacement of main switchboard | 98125 | $405,684 |
| Oct 2, 2025 | Panel upgrade, 100 kW100kw generator, 4/0 cam lock cords lug'd onto the house panel feeders- temp power | 98125 | $20,000 |
| Apr 23, 2025 | SolarRooftop Photovoltaic System - 33.11kWDC, 39.74 kWAC, associated with electrical permit number… | 98118 | $98,000 |
| Feb 20, 2025 | Panel upgradeLike for kind replacement , 400A 9 stack meter replacement, ph, 3w-120/240v.65kA, 400A 9-stack… | 98105 | $15,000 |
| Jul 30, 2024 | Panel upgrade120V 15A Hard Wire Power for DoorKing & Altonix Panels (2 devices) | 98104 | $1,000 |
| Apr 18, 2024 | Panel upgradeAdd a new circuit from panel sb2 in the p1 electrical room to the 1st flr comm room to tie in the… | 98115 | not stated |
| Oct 9, 2023 | Panel upgradeRun 330' of EMT conduit from panel to pump Install 1050' of #8 THHN from panel to pump | 98125 | $15,000 |
| Jul 29, 2022 | Panel upgradeAdding (8) electric vehicle chargers on existing 1000A panel | Not listed | $17,000 |
| Jul 29, 2022 | EV chargerAdding (8) electric vehicle chargers on existing 1000A panel | Not listed | $17,000 |
What to ask before you hire
About Unity Electric
- Ask for their license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Unity Electric
Five quick questions. We pass your request to Unity Electric.
Request for Unity Electric
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Unity Electric. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 98125 and 98102
- As You Wish Electric
- Eco Electric & Plumbing
- The Electric Company of Seattle
- Kbg LLC Plateau Electric
- Lumenkraft Electric LLC
- Res Inc
See all 327 panel upgrade electricians in Seattle, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.