contractors.fyi
Sign in

Zorko Electric Inc

Panel upgrade electrician based in Duvall.

  • License active
  • No current bond on the state's list for this license

7 jobs on Seattle permits, 2024 to 2025: 4 panel upgrades, 3 EV charger installations. 284th most panel upgrade permits of 327 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ZORKOEI121OK, active in the state's records on Oct 3, 2026GENERALChecks out
Insurance and bond?No current bond on the state's list for this licenseNo liability insurance policy on the state's list for this license.Ask them
Jobs on record7 jobs on Seattle permits, 2024 to 2025: 4 panel upgrades, 3 EV charger installationsThey are based in Duvall. Work outside Seattle is not in these records.284th most panel upgrade permits of 327 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $26,750 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a panel upgrade permit stays open about 37 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2024: 1 jobQ2 2024: 2 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsBusiest: 2 jobsBusiest: 2 jobs20242025
Each bar is 3 months of permits. The tallest is 2 jobs, April to June 2024.

Where they work most

  • 981123 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Feb 4, 2025Panel upgradePreviously permit #7063040-EL. Install one 200a 120/208v panel fed from existing series-rated…Not listed$28,500
Feb 4, 2025EV chargerPreviously permit #7063040-EL. Install one 200a 120/208v panel fed from existing series-rated…Not listed$28,500
Dec 31, 2024Panel upgradeInstallation of new 200a 120/208v/3 panel fed from existing 200a meter baseNot listed$25,000
Dec 31, 2024EV chargerInstallation of new 200a 120/208v/3 panel fed from existing 200a meter baseNot listed$25,000
Jun 28, 2024Panel upgradeNew 40A 240V 1PH circuit and branch wiring from panel to car stall98112$4,012
Jun 28, 2024EV chargerNew 40A 240V 1PH circuit and branch wiring from panel to car stall98112$4,012
Feb 28, 2024Panel upgrade, 60 kWInstallation of 60kw standby natural gas generator and automatic transfer switch98112$92,525

What to ask before you hire

About Zorko Electric Inc

  • Ask for proof of liability insurance and a current bond.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Zorko Electric Inc

Five quick questions. We pass your request to Zorko Electric Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Zorko Electric Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 98112

See all 327 panel upgrade electricians in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.