contractors.fyi
Sign in

A-one Electric

Panel upgrade electrician working in Austin.

  • No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same city

53 jobs on Austin permits, 2021 to 2026: 49 panel upgrades, 4 EV charger installations. 23rd most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same cityLook them up on the state's license search.Ask them
Jobs on record53 jobs on Austin permits, 2021 to 2026: 49 panel upgrades, 4 EV charger installations23rd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, down from 7 the year before

Q4 2021: 5 jobsQ1 2022: 1 jobQ2 2022: 3 jobsQ3 2022: 1 jobQ4 2022: 3 jobsQ1 2023: 3 jobsQ2 2023: 5 jobsQ3 2023: 8 jobsQ4 2023: 2 jobsQ1 2024: 3 jobsQ2 2024: 2 jobsQ3 2024: 5 jobsQ4 2024: 1 jobQ1 2025: 1 jobQ2 2025: 2 jobsQ3 2025: 2 jobsQ1 2026: 3 jobsQ2 2026: 1 jobQ3 2026: 2 jobsBusiest: 8 jobsLatest: 2 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 8 jobs, July to September 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 7874910 jobs
  • 787239 jobs
  • 787457 jobs
  • 787354 jobs
  • 787573 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 31, 2026Panel upgradeMeter and panel change out Grounding gas meter Installing 2 ground rods and grounding the panel78753not stated
Jul 6, 2026Panel upgradeMeter and panel change out grounding gas meter Installing 2 ground rods and grounding the panel78756not stated
May 30, 2026Panel upgradeMeter and panel change out grounding gas meter Installing 2 ground rods and grounding the panel78723not stated
Mar 2, 2026Panel upgradeReplace panel meter and riser on house78752not stated
Feb 24, 2026Panel upgradeReplace old meter and panel78745not stated
Jan 13, 2026Panel upgradeRepair of main service78723not stated
Sep 18, 2025Panel upgradeNo details on the permit78702not stated
Aug 12, 2025Panel upgradeReplacing meter can riser and panel78749not stated
May 27, 2025Panel upgradeReplace old existing panel meter and wire78749not stated
May 20, 2025Panel upgrade, 20 kWService upgrade and adding 20kw generator78731not stated
Jan 31, 2025EV chargerService repair and install EV charger78723not stated
Nov 18, 2024Panel upgradeReplacing meter can main panel and sub panel78749not stated
Sep 26, 2024Panel upgradeReplace service - main panel and meter can78723not stated
Aug 16, 2024Panel upgrade, 24 kWChanging out the service main panel and meter can as well 9/19/2024 24kw generator install78731not stated
Aug 5, 2024Panel upgradeChange out 200A overhead service78749not stated
Jul 22, 2024Panel upgradeChanging out service panel - removing FPE panel and installing a GE panel78745not stated
Jul 17, 2024Panel upgradeReplacing service panel and meter can78745not stated
Jun 17, 2024EV chargerAdd 220 circuit for EV charger78744not stated
May 8, 2024Panel upgradeReplace service - panel and meter can78723not stated
Mar 25, 2024Panel upgradeReplace old FPE panel and meter can78705not stated
Feb 27, 2024Panel upgradeChanging out main panel meter and riser78757not stated
Jan 5, 2024EV chargerInstalling a EV charger78745not stated
Dec 6, 2023Panel upgradeReplacing panel riser and meter can78723not stated
Oct 4, 2023Panel upgradeReplacing main panel and meter can78749not stated
Aug 30, 2023Panel upgradeRemove old service meter can riser and wires and replace with a 200A meter can panel riser and…78746not stated
Aug 21, 2023Panel upgradeEmergency repair - tree limb fell on service wire78746not stated
Aug 9, 2023Panel upgradeEmergency repair - burnt busbar in panel78749not stated
Aug 9, 2023Panel upgradeEmergency panel change out - no meter change out78703not stated
Aug 8, 2023Panel upgradeRemove old main panel - install new main panel on side of house closer to the incoming service wire78703not stated
Jul 21, 2023Panel upgradeMoving service (riser and panel) to front of the house so it will not cross over the house78758not stated
Jul 21, 2023Panel upgradeReplace main panel meter can and riser - overhead service78757not stated
Jul 17, 2023Panel upgradeReplacing service panel meter can78749not stated
May 31, 2023Panel upgradeReplace meter can and main panel for underground service78749not stated
May 26, 2023Panel upgradeElectrical panel replace and upgrading the meter78758not stated
Apr 26, 2023Panel upgradeDuring storm in February - tree limb fell on service wire - pulled cloth riser away from the house…78704not stated
Apr 26, 2023Panel upgradeReplace old FPE panel and meter can78704not stated
Apr 26, 2023Panel upgradeReplace FPE main panel and meter can Replace FPE sub panel78745not stated
Mar 20, 2023Panel upgrade2023 Winter Weather Event During the winter storm a tree limb fell on the service wire pulling the…78736not stated
Mar 17, 2023Panel upgradeUpgrade main service panel outside to 225A - and change old main panel to sub panel - back to back…78746not stated
Mar 6, 2023Panel upgradeChange out service to include meter can panel and riser78749not stated

What to ask before you hire

About A-one Electric

  • Ask for their electrical contractor license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from A-one Electric

Five quick questions. We pass your request to A-one Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to A-one Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78749 and 78723

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.