contractors.fyi
Sign in

A Team Home Services

Panel upgrade electrician working in Austin.

  • License active

16 jobs on Austin permits, 2025 to 2026: 11 panel upgrades, 5 EV charger installations. 108th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 38287, valid until Jul 11, 2027We matched it by the phone on their permits.Checks out
Jobs on record16 jobs on Austin permits, 2025 to 2026: 11 panel upgrades, 5 EV charger installations108th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

15 jobs in the last 12 months, up from 1 the year before

Q3 2025: 1 jobQ1 2026: 7 jobsQ2 2026: 6 jobsQ3 2026: 2 jobsBusiest: 7 jobs2026
Each bar is 3 months of permits. The tallest is 7 jobs, January to March 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787454 jobs
  • 787462 jobs
  • 787252 jobs
  • 787172 jobs
  • 787282 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 14, 2026Panel upgradeInstall/replace 200 amp underground meter base; install/replace 200 amp main breaker panel; install…78745not stated
Aug 14, 2026EV chargerInstall/replace 200 amp underground meter base; install/replace 200 amp main breaker panel; install…78745not stated
Jun 26, 2026Panel upgradeInstall dedicated 60 amp ev circuit from outdoor main breaker to garage; install chargepoint ev…78746not stated
Jun 26, 2026EV chargerInstall dedicated 60 amp ev circuit from outdoor main breaker to garage; install chargepoint ev…78746not stated
Jun 8, 2026Panel upgradeInstall/replace 200 amp main breaker panel; install/replace 200 amp meter enclosure; install…78731not stated
May 7, 2026Panel upgradeInstall/replace 150 amp main breaker panel; install/replace 200 amp meter enclosure and riser…78757not stated
Apr 17, 2026Panel upgradeInstalling 60 amp dedicated ev circuit from sub panel; install emporia ev charger with load shed;…78725not stated
Apr 17, 2026EV chargerInstalling 60 amp dedicated ev circuit from sub panel; install emporia ev charger with load shed;…78725not stated
Mar 30, 2026Panel upgrade8 install/replace main breaker panel (200 amp); install/replace 200 amp meter base (underground);…78717not stated
Mar 30, 2026EV charger8 install/replace main breaker panel (200 amp); install/replace 200 amp meter base (underground);…78717not stated
Feb 27, 2026Panel upgradeInstall/replace 125 amp outdoor main breaker panel; install/replace 200 amp meter…78745not stated
Feb 9, 2026Panel upgradeReplace meter base (underground) replace main breaker panel (200 amp); install complete grounding…78728not stated
Feb 9, 2026EV chargerReplace meter base (underground) replace main breaker panel (200 amp); install complete grounding…78728not stated
Jan 26, 2026Panel upgradeRemove existing electrical service equipment and install a new 200-amp main breaker panel (outdoor…78749not stated
Jan 2, 2026Panel upgradeInstall new 200 amp meter base install new 125 amp main breaker panel update main grounding system…78724not stated
Sep 3, 2025Panel upgrade(200a) remove existing equipment; install new 200a service panel and new 200a meter base…78745not stated

What to ask before you hire

About A Team Home Services

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from A Team Home Services

Five quick questions. We pass your request to A Team Home Services.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to A Team Home Services. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78746

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.