contractors.fyi
Sign in

AC Electric

EV charger installer working in Austin.

  • License active

28 jobs on Austin permits, 2021 to 2026: 14 EV charger installations, 12 panel upgrades, 2 solar installations. 23rd most EV charger permits of 93 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 20902, valid until Dec 2, 2026We matched it by the business name in the same city, Austin.Checks out
Jobs on record28 jobs on Austin permits, 2021 to 2026: 14 EV charger installations, 12 panel upgrades, 2 solar installations23rd most EV charger permits of 93 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 14 EV charger permits, 1 mention a panel upgrade.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a EV charger permit stays open about 6 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 5 days. How long EV charger jobs take.

Track record

4 jobs in the last 12 months, about the same as 4 the year before

Q3 2021: 1 jobQ4 2021: 1 jobQ1 2022: 1 jobQ2 2022: 2 jobsQ3 2022: 2 jobsQ4 2022: 3 jobsQ1 2023: 6 jobsQ2 2024: 2 jobsQ3 2024: 2 jobsQ4 2024: 1 jobQ3 2025: 3 jobsQ3 2026: 4 jobsBusiest: 6 jobsLatest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, January to March 2023. Across Austin, all contractors together had 12% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787443 jobs
  • 787023 jobs
  • 787312 jobs
  • 787592 jobs
  • 787042 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 4, 2026EV charger78731not stated
Jul 28, 2026Panel upgrade10900 Catthorn needs the main panel replaced78759not stated
Jul 22, 2026Panel upgradeInstall EV charger outlet in garage.The main panel is on right side of the building. The charger…78744not stated
Jul 22, 2026EV chargerInstall EV charger outlet in garage.The main panel is on right side of the building. The charger…78744not stated
Sep 16, 2025EV chargerUpgrade AE meter socket and add a main breaker Add EV charger78745not stated
Sep 8, 2025EV chargerReplace existing Zinsco breaker box with a new GE breaker box with MCB installing EV charger78748not stated
Jul 18, 2025EV chargerUpgrade existing 125 amp overhead service to 200 amps and install circuit for future EV charger78756not stated
Oct 2, 2024EV charger78723not stated
Sep 16, 2024EV charger78704not stated
Jul 11, 2024EV charger78731not stated
Jun 14, 2024EV charger78753not stated
Jun 3, 2024Panel upgradeReplace 3 old Austin Energy meters 3 FPE panels amd add main breakers78705not stated
Mar 24, 2023Panel upgradeReplace existing meter and breaker boxes with new meter sockets and breaker panels. This is a CDP…78741not stated
Mar 23, 2023EV chargerInstall EV charger outlet on shed wall78704not stated
Feb 8, 2023EV chargerInstall a EV charger78705not stated
Feb 8, 2023EV charger78702not stated
Feb 7, 2023EV chargerInstall EV charger oh side of garage78702not stated
Jan 26, 2023SolarReplace existing roofing structure with all new supporting system bigger pitch new insulation and…78751not stated
Nov 21, 2022Panel upgradeRemodel kitchen and master bathroom Install a subpanel Rebuild existing overhead service78759not stated
Oct 26, 2022Panel upgradeRequest To Disconnect Replace Main Panel only78736not stated
Oct 3, 2022Panel upgradeThe riser wire is bare. We need to replace the riser wire 2 meter sockets and 2 main outside panels…78757not stated
Sep 19, 2022EV charger78725not stated
Aug 31, 2022Panel upgradeReplace old meter socket and breaker panel78735not stated
May 17, 2022Panel upgradeReplace main panel and add a main breaker78702not stated
May 6, 2022Panel upgradeReplace Federal panel78758not stated
Mar 4, 2022SolarInstall solar panels on roof78744not stated
Oct 13, 2021Panel upgradeReplace exposed service wires **(Service Upgrade) -JW80178757not stated
Sep 27, 2021Panel upgradeReplace Zinsco panel78736not stated

What to ask before you hire

About AC Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from AC Electric

Five quick questions. We pass your request to AC Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to AC Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 78744 and 78702

See all 93 EV charger installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.