contractors.fyi
Sign in

Airco Mechanical Ltd

Panel upgrade electrician working in Austin.

  • License active

12 jobs on Austin permits, 2022 to 2026: 9 panel upgrades, 2 heat pump installations, 1 EV charger installation. 135th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 35427, valid until Sep 7, 2027We matched it by the phone on their permits.Checks out
Jobs on record12 jobs on Austin permits, 2022 to 2026: 9 panel upgrades, 2 heat pump installations, 1 EV charger installation135th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q2 2022: 1 jobQ4 2022: 2 jobsQ1 2023: 1 jobQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 1 jobQ1 2025: 2 jobsQ2 2025: 1 jobQ2 2026: 1 jobBusiest: 2 jobsBusiest: 2 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 2 jobs, October to December 2022.

Where they work most

  • 787562 jobs
  • 787381 job
  • 787451 job
  • 787461 job
  • 787271 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 25, 2026Panel upgradeNeed Permit for ETJ upgrading to 225 AMP service78738not stated
Jun 12, 2025Panel upgrade**PANEL REPLACEMENT** PER EC agent: meter work will be done as well78745not stated
Mar 14, 2025EV chargerInstall Level 2 EV Charger in Residence78756not stated
Feb 20, 2025Panel upgrade**replacement existing meter and panel**78746not stated
Oct 10, 2024Heat pumpReplacement of mini-split system78756not stated
Jun 17, 2024Panel upgradeReplace service riser meter add service panel w/ main disconnect Transfer switch and new sub panel78727not stated
Feb 5, 2024Panel upgradeRebuild Electrical Service Remove exsiting Zinsco panel and 150 amp meter can78749not stated
Sep 29, 2023Panel upgrade**request to disconnect** need to add transfer switch; remove meter; remove wiring from load side…78757not stated
Jan 24, 2023Panel upgradeNo details on the permit78703not stated
Oct 28, 2022Panel upgradeReplace old exterior electrical panel with updated electrical panel and breakers78731not stated
Oct 18, 2022Panel upgrade, 6788 sq ftNew 6788 SqFT home in the ETJ with a 350AMP service78734not stated
Apr 11, 2022Heat pumpHeat pump replacement like for like no ductwork78759not stated

What to ask before you hire

About Airco Mechanical Ltd

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Airco Mechanical Ltd

Five quick questions. We pass your request to Airco Mechanical Ltd.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Airco Mechanical Ltd. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78756 and 78738

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.