contractors.fyi
Sign in

Southern Cross Electric Dba: Aussie Electric Inc.

Panel upgrade electrician working in Austin.

  • License active

13 jobs on Austin permits, 2021 to 2025: 10 panel upgrades, 2 EV charger installations, 1 solar installation. 131st most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 21779, valid until Mar 23, 2027We matched it by the phone on their permits.Checks out
Jobs on record13 jobs on Austin permits, 2021 to 2025: 10 panel upgrades, 2 EV charger installations, 1 solar installation131st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 1 jobQ1 2022: 1 jobQ2 2022: 2 jobsQ4 2022: 1 jobQ1 2023: 1 jobQ2 2023: 2 jobsQ3 2024: 3 jobsQ1 2025: 1 jobQ3 2025: 1 jobBusiest: 3 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2024.

Where they work most

  • 787463 jobs
  • 787042 jobs
  • 787352 jobs
  • 787031 job
  • 787311 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 5, 2025Panel upgradeWe are upgrading the existing electrical service with a new 200amp service78703not stated
Feb 2, 2025Panel upgradeGday we need to upgrade the existing 200amp service to a 350amp service78746not stated
Sep 13, 2024Panel upgradeRequest to disconnect Upgrade existing 125amp service to 200amp to accommodate 50amp EV charger78704not stated
Sep 13, 2024EV chargerRequest to disconnect Upgrade existing 125amp service to 200amp to accommodate 50amp EV charger78704not stated
Sep 9, 2024EV chargerInstall 50amp circuit in garage for EV charger78731not stated
May 16, 2023Panel upgradeWe need to upgrade/replace existing service with new 200amp service and back up generator78746not stated
May 12, 2023Panel upgradeNeed to remove an old interior panel that is now being used as a junction box78735not stated
Feb 13, 2023Panel upgrade2023 Winter Weather Event STORM DAMAGE Rebuild damaged service due to storm78758not stated
Oct 12, 2022Panel upgradeRequest to disconnect for service upgrade78735not stated
Jun 1, 2022Panel upgradeWe need to upgrade old existing service that has a federal pacific panel78744not stated
Apr 13, 2022Panel upgradeWe need to upgrade existing overhead service as the existing panel is a federal pacific in bad…78669not stated
Mar 9, 2022SolarSteel structure to support solar photovoltaic array78730not stated
Nov 19, 2021Panel upgradeWe need to re locate existing 200amp service from the rear of house to a service rack at back of…78746not stated

What to ask before you hire

About Southern Cross Electric Dba: Aussie Electric Inc.

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Southern Cross Electric Dba: Aussie Electric Inc.

Five quick questions. We pass your request to Southern Cross Electric Dba: Aussie Electric Inc..

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Southern Cross Electric Dba: Aussie Electric Inc.. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78746 and 78704

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.