contractors.fyi
Sign in

American Residential Services LLC

Panel upgrade electrician working in Austin.

  • License active

31 panel upgrade jobs on Austin permits, 2023 to 2026. 33rd most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 35534, valid until Oct 26, 2027We matched it by the business name in the same city, Austin.Checks out
Jobs on record31 panel upgrade jobs on Austin permits, 2023 to 2026Every permit we have for them is panel upgrade.33rd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

15 jobs in the last 12 months, up from 7 the year before

Q1 2023: 1 jobQ3 2023: 1 jobQ4 2023: 3 jobsQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 2 jobsQ4 2024: 1 jobQ1 2025: 2 jobsQ2 2025: 4 jobsQ4 2025: 6 jobsQ1 2026: 6 jobsQ2 2026: 1 jobQ3 2026: 2 jobsBusiest: 6 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, October to December 2025. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787455 jobs
  • 787544 jobs
  • 787234 jobs
  • 787582 jobs
  • 787502 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 14, 2026Panel upgrade78731not stated
Sep 11, 2026Panel upgrade78746not stated
Jun 16, 2026Panel upgrade200 amp service upgrade78749not stated
Mar 19, 2026Panel upgrade78758not stated
Mar 17, 2026Panel upgradeReplacing 200amp panel78754not stated
Jan 6, 2026Panel upgrade78759not stated
Jan 6, 2026Panel upgrade78745not stated
Jan 6, 2026Panel upgrade78758not stated
Jan 6, 2026Panel upgrade78735not stated
Dec 8, 2025Panel upgradeReplacing 200amp meter & panel78754not stated
Dec 3, 2025Panel upgradeAPPLY FOR ELECTRICAL PERMIT FOR PLUMBING PERMIT 2025-134238 PP (PER FAILED INSPECTION: No…78754not stated
Nov 13, 2025Panel upgrade78728not stated
Nov 13, 2025Panel upgrade78745not stated
Oct 28, 2025Panel upgradeNew 200amp meter & new main panel78723not stated
Oct 13, 2025Panel upgrade200 Amp service upgrade with 200 Amp meter78742not stated
Apr 28, 2025Panel upgradeReplace federal pacific main panel and sub panel with updated panels of same size78745not stated
Apr 9, 2025Panel upgradeUpgrade 150 Amp service to a 200 Amp service with new meter and riser and new sub panel78729not stated
Apr 9, 2025Panel upgradeReplace 125 main panel with new 125 Amp main panel/ with new meter can78723not stated
Apr 4, 2025Panel upgradeEmergency main panel replacement No meter can78754not stated
Mar 20, 2025Panel upgrade200 amp service upgrade with new 200 amp meter78757not stated
Mar 7, 2025Panel upgradeReplace existing 200 Amp main panel with new 200 Amp main panel of the same type and size no change…78750not stated
Dec 18, 2024Panel upgrade200 amp Service upgrade new 200 Amp meter can78727not stated
Aug 1, 2024Panel upgradeRequest to disconnect Replace existing main panel with 125amp mb panel78753not stated
Jul 11, 2024Panel upgradeReplace existing sub panel with new sub panel78745not stated
Jun 20, 2024Panel upgradeService upgrade78745not stated
Feb 27, 2024Panel upgradeUpgrade existing 125 amp service to 200 amp service78751not stated
Nov 13, 2023Panel upgradeReplace existing main panel with 125 main panel78750not stated
Nov 13, 2023Panel upgradeUpgrade service to 200 amp meter and panel78723not stated
Oct 14, 2023Panel upgradeSwap out 100 amp sub panel for exact same 100 amp sub panel78744not stated
Sep 21, 2023Panel upgradeReplace existing sub panel with new identical sub panel78744not stated
Mar 20, 2023Panel upgradeRemove old zinsco panel78723not stated

What to ask before you hire

About American Residential Services LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from American Residential Services LLC

Five quick questions. We pass your request to American Residential Services LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to American Residential Services LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78754

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.