contractors.fyi
Sign in

Bee Electric

Panel upgrade electrician working in Austin.

  • Texas electrical contractor license 18331, expired Aug 17, 2026

24 panel upgrade jobs on Austin permits, 2021 to 2026. 52nd most panel upgrade permits of 327 contractors in Austin.

The state showed this license as "expired" on Oct 4, 2026. Do not hire until that is cleared.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 18331, expired Aug 17, 2026We matched it by the business name in the same city, Elgin.Problem
Jobs on record24 panel upgrade jobs on Austin permits, 2021 to 2026Every permit we have for them is panel upgrade.52nd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

2 jobs in the last 12 months, down from 6 the year before

Q4 2021: 4 jobsQ1 2022: 2 jobsQ3 2022: 3 jobsQ1 2023: 1 jobQ2 2023: 1 jobQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 3 jobsQ4 2024: 1 jobQ1 2025: 1 jobQ2 2025: 1 jobQ3 2025: 2 jobsQ1 2026: 1 jobQ2 2026: 1 jobBusiest: 4 jobsLatest: 1 job20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2021. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787214 jobs
  • 787233 jobs
  • 787243 jobs
  • 787522 jobs
  • 787582 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
May 29, 2026Panel upgradeUpgrade with a new 200amp meter can and 200amp panel78752not stated
Feb 25, 2026Panel upgradeUpgrade existing electrical service to 200 amps78721not stated
Sep 18, 2025Panel upgradeNo details on the permit78744not stated
Jul 25, 2025Panel upgrade***Storm Related-Hyatt*** Tree fell and tore down electric service78731not stated
Jun 19, 2025Panel upgradeUpgrade existing service to 200 amp78721not stated
Mar 17, 2025Panel upgradeUpgrade existing electrical underground service to 200 amp with new 200 amp meter can and new main…78758not stated
Nov 20, 2024Panel upgradeWe are running at least 50 ft of 12/2 110 volt wire to feed the electrical plug and light for dryer…78723not stated
Sep 23, 2024Panel upgradeRequest to Disconnect upgrade existing service to 200 amp new 200 amp meter can and new 200 main…78748not stated
Sep 20, 2024Panel upgradeInstall portable generator and transfer switch and a loop system from a panel to transfer switch…78759not stated
Sep 5, 2024Panel upgradeEmergency repair after hours.Replace burned meter blocks and 2/0 wire from load side of meter to…78724not stated
May 24, 2024Panel upgradeRequest to Disconnect for new 200 meter and 200 amp main breaker panel78753not stated
Feb 9, 2024Panel upgradeRequest to disconnect78702not stated
Aug 17, 2023Panel upgradeUpgrade underground electrical service to 200 amps78745not stated
Jun 5, 2023Panel upgradeReplace sub panel78723not stated
Feb 11, 2023Panel upgrade2023 Winter Weather Event Storm damage to service78723not stated
Sep 21, 2022Panel upgradeNo details on the permit78724not stated
Jul 26, 2022Panel upgradeInstall pole in yard to build new 200 amp electrical service with new meter can 200 amp main…78724not stated
Jul 12, 2022Panel upgradeUpgrade existing electrical service to 200 amp78746not stated
Mar 10, 2022Panel upgradeBuild new 200 amp main breaker panel78738not stated
Feb 28, 2022Panel upgradeNo details on the permit78721not stated
Nov 16, 2021Panel upgradeUpgrade electrical service to 200 amp78752not stated
Nov 11, 2021Panel upgradeWiring of new duplex with 2- 200 amp meter cans and 2-200 main breaker panels78721not stated
Nov 10, 2021Panel upgradeInterior remodel: Add additional sink in master bathroom move toilet tub to shower conversion add…78758not stated
Oct 15, 2021Panel upgradeWe are replacing current service with a 200 amp service78722not stated

What to ask before you hire

About Bee Electric

  • Do not hire until the state shows the license as active.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bee Electric

Five quick questions. We pass your request to Bee Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bee Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78721 and 78723

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.