contractors.fyi
Sign in

Drh Electrical & Home Services LLC

Panel upgrade electrician working in Austin.

  • License active

26 jobs on Austin permits, 2021 to 2026: 25 panel upgrades, 1 EV charger installation. 47th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 34928, valid until Dec 23, 2026We matched it by the business name in the same city, Bertram.Checks out
Jobs on record26 jobs on Austin permits, 2021 to 2026: 25 panel upgrades, 1 EV charger installation47th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

8 jobs in the last 12 months, down from 11 the year before

Q4 2021: 1 jobQ1 2022: 1 jobQ3 2022: 1 jobQ1 2023: 1 jobQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 3 jobsQ3 2025: 4 jobsQ4 2025: 3 jobsQ1 2026: 3 jobsQ2 2026: 2 jobsBusiest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, July to September 2025. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787454 jobs
  • 787493 jobs
  • 787573 jobs
  • 787232 jobs
  • 787532 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 9, 2026Panel upgradeExpress: Replace windowsdoors s4s.Gut kitchen&baths&all drywallinsulation as needed.New…78749not stated
May 21, 2026Panel upgradeThis is for a service upgrade78745not stated
Jan 23, 2026Panel upgradeThis is for changing service main panel shows signs of arcing78723not stated
Jan 16, 2026Panel upgrade78749not stated
Jan 14, 2026Panel upgrade78745not stated
Dec 11, 2025Panel upgradeThis is for replacing a damaged panel with main breaker panel. upgrading the main service breaker…78745not stated
Dec 1, 2025Panel upgradeNo details on the permit78757not stated
Nov 21, 2025Panel upgrade78749not stated
Aug 8, 2025Panel upgradeThis is for upgrading an old 100 amp service to a new 200 amp service we will upgrade to new meter…78756not stated
Jul 30, 2025Panel upgradeThere are existing 2 meters with 2 panels already grouped together in the back unit that is where…78751not stated
Jul 21, 2025Panel upgradeThis is for upgrading the existing old service to a new 200 amp meter can and a panel with a 200…78753not stated
Jul 18, 2025Panel upgradeThis is for replacing the old service on the house to a new one new 200 amp main breaker panel new…78758not stated
May 14, 2025Panel upgradeThis is for chanign out an old overhead faulty service to a neww 200 amp meter can200 amp main…78744not stated
May 13, 2025Panel upgradeUpgrading existing 125 amp service to a 200 amp and relocating to a member owned pole overhead78757not stated
Apr 21, 2025Panel upgradeThis is for a service upgrade overhead panel does not have a main breaker and doesnt have enough…78759not stated
Feb 12, 2025Panel upgradeThis is for replacing the panel ONLY existing panel does not have a main breaker this is for wiring…78727not stated
Feb 5, 2025Panel upgradeExpress foundation repair Revision: replacement of drain lines to PVC water supply & gas…78723not stated
Dec 16, 2024Panel upgradeThis will be a same day disconnect and reconnect78757not stated
Dec 12, 2024EV chargerAdding a 50 amp rated car charger to the outside of the house78759not stated
May 7, 2024Panel upgradeThis is for upgrading an old meter can and old federal pacific panel to a new 200 amp main breaker…78753not stated
Feb 5, 2024Panel upgrade, 200 sq ftThis is for wiring a small building less than 200 square feet we will do some lights and some…78727not stated
Sep 7, 2023Panel upgradeThis is for doing a service upgrade the old service is an old 100 amp meter and a small panel with…78746not stated
Feb 6, 2023Panel upgradeThis is for a new Permanent 200 amp service Overhead for a new residential house within the etj78734not stated
Aug 12, 2022Panel upgradeThis is for replacing an existing 100 amp service to a new 200 amp service we are replacing the…78729not stated
Mar 4, 2022Panel upgradeWe are going to wire an 8x16 office pod less than 200 sf and we are going to run power from already…78758not stated
Nov 22, 2021Panel upgradeThis is for Upgrading a 100 amp service to a 200 amp service with new 200 amp main breaker panel…78745not stated

What to ask before you hire

About Drh Electrical & Home Services LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Drh Electrical & Home Services LLC

Five quick questions. We pass your request to Drh Electrical & Home Services LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Drh Electrical & Home Services LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78749

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.