contractors.fyi
Sign in

Bedwell Electric LLC

Panel upgrade electrician working in Austin.

  • License active

38 jobs on Austin permits, 2022 to 2026: 26 panel upgrades, 12 EV charger installations. 41st most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 34192, valid until Feb 13, 2027We matched it by the phone on their permits.Checks out
Jobs on record38 jobs on Austin permits, 2022 to 2026: 26 panel upgrades, 12 EV charger installations41st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

15 jobs in the last 12 months, up from 6 the year before

Q3 2022: 3 jobsQ4 2022: 1 jobQ1 2023: 4 jobsQ2 2023: 1 jobQ3 2023: 1 jobQ1 2024: 2 jobsQ2 2024: 5 jobsQ4 2024: 2 jobsQ2 2025: 3 jobsQ3 2025: 1 jobQ4 2025: 7 jobsQ1 2026: 2 jobsQ2 2026: 3 jobsQ3 2026: 3 jobsBusiest: 7 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 7 jobs, October to December 2025. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787454 jobs
  • 787594 jobs
  • 787354 jobs
  • 787043 jobs
  • 787463 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 11, 2026Panel upgradeReplace meter can and 150 Amp main breaker panel underground service78749not stated
Aug 7, 2026EV chargerRun 60 Amp circuit for EV wall connector in garage78756not stated
Aug 7, 2026EV chargerRun 60 Amp circuit for EV wall connector78704not stated
Jun 23, 2026Panel upgradeReplace main breaker in outside electrical panel78717not stated
May 4, 2026EV chargerRun 60 Amp circuit for EV wall connector charger78736not stated
Apr 2, 2026Panel upgradeReplace outside underground electrical service with 200 Amp meter can and panel78753not stated
Mar 11, 2026EV chargerInstall 60 Amp circuit for EV charger78757not stated
Jan 8, 2026Panel upgradeReplace meter can and main electrical panel78752not stated
Dec 24, 2025EV chargerInstall 60 Amp circuit for EV wall connector in garage78730not stated
Dec 9, 2025Panel upgradeReplace electrical panel and meter can for underground service78745not stated
Dec 3, 2025Panel upgradeReplace arced wire between meter can and panel78745not stated
Nov 7, 2025Panel upgradeInstall EV wall connector on existing wire run from panel78745not stated
Nov 7, 2025EV chargerInstall EV wall connector on existing wire run from panel78745not stated
Oct 8, 2025Panel upgradeInstall two Automatic Transfer Switch by existing electrical service78733not stated
Oct 8, 2025Panel upgradeUpgrade existing overhead electrical service to 200 Amp. Replace existing sub panel in garage78722not stated
Jul 10, 2025Panel upgradeInstall Automatic Transfer Switch next to existing overhead 200 Amp meter can78703not stated
Jun 18, 2025Panel upgradeRequest to Disconnect: Install Automatic Transfer Switch next to existing overhead 200 Amp meter…78757not stated
Jun 18, 2025Panel upgradeUpgrade existing underground electrical service to 200 Amp78736not stated
Apr 10, 2025Panel upgradeReplace meter can and 200 Amp main electrical panel for underground service78746not stated
Nov 11, 2024Panel upgradeREQUEST TO DISCONNECT Install 150 Amp and 200 Amp Automatic Transfer Switch next to existing panels78730not stated
Oct 22, 2024Panel upgradeRequest to Disconnect Install Automatic Transfer Switch to the left of existing underground 200 Amp…78746not stated
Jun 5, 2024Panel upgrade**Request to Disconnect** Install 100 Amp automatic transfer switch next to meter can78731not stated
May 22, 2024Panel upgrade**Request to Disconnect** Install 200 Amp automatic transfer switch next meter can78759not stated
May 22, 2024Panel upgrade**Request to Disconnect** Install 200 Amp automatic transfer switch next to meter can78704not stated
Apr 5, 2024Panel upgrade***REQUEST TO DISCONNECT*** Contractor Disconnect program. Install 200 AMp Automatic Transfer…78704not stated
Apr 3, 2024Panel upgrade**REQUEST TO DISCONNECT** Contractor disconnect program Install 200 Amp automatic transfer switch…78759not stated
Feb 23, 2024Panel upgradeUpgrade underground electrical service to 200 Amp78753not stated
Feb 23, 2024Panel upgrade*Request to disconnect* Install Automatic Transfer Switch next to meter can (underground) Remove…78735not stated
Aug 2, 2023Panel upgradeReplace existing main panel and meter can with 200 Amp underground78758not stated
May 18, 2023EV chargerRun dedicated circuit for EV wall connector in garage78735not stated
Mar 29, 2023Panel upgradeInstall EV circuit in garage78759not stated
Mar 29, 2023EV chargerInstall EV circuit in garage78759not stated
Mar 16, 2023Panel upgradeInstall automatic transfer switch panel for generator78746not stated
Jan 11, 2023Panel upgradeMove existing meter can and run power form Automatic transfer switch panel78733not stated
Oct 24, 2022EV chargerInstall circuit for EV charger in garage78739not stated
Sep 13, 2022EV chargerRun dedicated 240 Volt circuit for EV charger78735not stated
Aug 31, 2022EV chargerInstall circuit in garage for EV charger78735not stated
Jul 28, 2022EV chargerRun dedicated circuit to garage for car charger78727not stated

What to ask before you hire

About Bedwell Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bedwell Electric LLC

Five quick questions. We pass your request to Bedwell Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bedwell Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78759

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.