Bedwell Electric LLC
Panel upgrade electrician working in Austin.
- License active
38 jobs on Austin permits, 2022 to 2026: 26 panel upgrades, 12 EV charger installations. 41st most panel upgrade permits of 327 contractors in Austin.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Texas electrical contractor license 34192, valid until Feb 13, 2027We matched it by the phone on their permits. | Checks out |
| Jobs on record | 38 jobs on Austin permits, 2022 to 2026: 26 panel upgrades, 12 EV charger installations41st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026. |
Records: City of Austin permits.
Cost and timing
Permit timeline
Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.
Track record
15 jobs in the last 12 months, up from 6 the year before
Where they work most
- 787454 jobs
- 787594 jobs
- 787354 jobs
- 787043 jobs
- 787463 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Aug 11, 2026 | Panel upgradeReplace meter can and 150 Amp main breaker panel underground service | 78749 | not stated |
| Aug 7, 2026 | EV chargerRun 60 Amp circuit for EV wall connector in garage | 78756 | not stated |
| Aug 7, 2026 | EV chargerRun 60 Amp circuit for EV wall connector | 78704 | not stated |
| Jun 23, 2026 | Panel upgradeReplace main breaker in outside electrical panel | 78717 | not stated |
| May 4, 2026 | EV chargerRun 60 Amp circuit for EV wall connector charger | 78736 | not stated |
| Apr 2, 2026 | Panel upgradeReplace outside underground electrical service with 200 Amp meter can and panel | 78753 | not stated |
| Mar 11, 2026 | EV chargerInstall 60 Amp circuit for EV charger | 78757 | not stated |
| Jan 8, 2026 | Panel upgradeReplace meter can and main electrical panel | 78752 | not stated |
| Dec 24, 2025 | EV chargerInstall 60 Amp circuit for EV wall connector in garage | 78730 | not stated |
| Dec 9, 2025 | Panel upgradeReplace electrical panel and meter can for underground service | 78745 | not stated |
| Dec 3, 2025 | Panel upgradeReplace arced wire between meter can and panel | 78745 | not stated |
| Nov 7, 2025 | Panel upgradeInstall EV wall connector on existing wire run from panel | 78745 | not stated |
| Nov 7, 2025 | EV chargerInstall EV wall connector on existing wire run from panel | 78745 | not stated |
| Oct 8, 2025 | Panel upgradeInstall two Automatic Transfer Switch by existing electrical service | 78733 | not stated |
| Oct 8, 2025 | Panel upgradeUpgrade existing overhead electrical service to 200 Amp. Replace existing sub panel in garage | 78722 | not stated |
| Jul 10, 2025 | Panel upgradeInstall Automatic Transfer Switch next to existing overhead 200 Amp meter can | 78703 | not stated |
| Jun 18, 2025 | Panel upgradeRequest to Disconnect: Install Automatic Transfer Switch next to existing overhead 200 Amp meter… | 78757 | not stated |
| Jun 18, 2025 | Panel upgradeUpgrade existing underground electrical service to 200 Amp | 78736 | not stated |
| Apr 10, 2025 | Panel upgradeReplace meter can and 200 Amp main electrical panel for underground service | 78746 | not stated |
| Nov 11, 2024 | Panel upgradeREQUEST TO DISCONNECT Install 150 Amp and 200 Amp Automatic Transfer Switch next to existing panels | 78730 | not stated |
| Oct 22, 2024 | Panel upgradeRequest to Disconnect Install Automatic Transfer Switch to the left of existing underground 200 Amp… | 78746 | not stated |
| Jun 5, 2024 | Panel upgrade**Request to Disconnect** Install 100 Amp automatic transfer switch next to meter can | 78731 | not stated |
| May 22, 2024 | Panel upgrade**Request to Disconnect** Install 200 Amp automatic transfer switch next meter can | 78759 | not stated |
| May 22, 2024 | Panel upgrade**Request to Disconnect** Install 200 Amp automatic transfer switch next to meter can | 78704 | not stated |
| Apr 5, 2024 | Panel upgrade***REQUEST TO DISCONNECT*** Contractor Disconnect program. Install 200 AMp Automatic Transfer… | 78704 | not stated |
| Apr 3, 2024 | Panel upgrade**REQUEST TO DISCONNECT** Contractor disconnect program Install 200 Amp automatic transfer switch… | 78759 | not stated |
| Feb 23, 2024 | Panel upgradeUpgrade underground electrical service to 200 Amp | 78753 | not stated |
| Feb 23, 2024 | Panel upgrade*Request to disconnect* Install Automatic Transfer Switch next to meter can (underground) Remove… | 78735 | not stated |
| Aug 2, 2023 | Panel upgradeReplace existing main panel and meter can with 200 Amp underground | 78758 | not stated |
| May 18, 2023 | EV chargerRun dedicated circuit for EV wall connector in garage | 78735 | not stated |
| Mar 29, 2023 | Panel upgradeInstall EV circuit in garage | 78759 | not stated |
| Mar 29, 2023 | EV chargerInstall EV circuit in garage | 78759 | not stated |
| Mar 16, 2023 | Panel upgradeInstall automatic transfer switch panel for generator | 78746 | not stated |
| Jan 11, 2023 | Panel upgradeMove existing meter can and run power form Automatic transfer switch panel | 78733 | not stated |
| Oct 24, 2022 | EV chargerInstall circuit for EV charger in garage | 78739 | not stated |
| Sep 13, 2022 | EV chargerRun dedicated 240 Volt circuit for EV charger | 78735 | not stated |
| Aug 31, 2022 | EV chargerInstall circuit in garage for EV charger | 78735 | not stated |
| Jul 28, 2022 | EV chargerRun dedicated circuit to garage for car charger | 78727 | not stated |
What to ask before you hire
About Bedwell Electric LLC
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Bedwell Electric LLC
Five quick questions. We pass your request to Bedwell Electric LLC.
Request for Bedwell Electric LLC
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Bedwell Electric LLC. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 78745 and 78759
- Jonestown Electrical Solutions LLC
- Salt Light & Electric
- Service Company of San Antonio LLC Dba Mr Electric of Austin
- Hart Electrical Services
- Matt Parker Electric LLC
- Jm Engineering, LLC
See all 327 panel upgrade electricians in Austin, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.