contractors.fyi
Sign in

Matt Parker Electric LLC

Panel upgrade electrician working in Austin.

  • License active

31 jobs on Austin permits, 2021 to 2026: 29 panel upgrades, 1 EV charger installation, 1 solar installation. 36th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 35505, valid until Oct 14, 2027We matched it by the phone on their permits.Checks out
Jobs on record31 jobs on Austin permits, 2021 to 2026: 29 panel upgrades, 1 EV charger installation, 1 solar installation36th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, up from 5 the year before

Q4 2021: 3 jobsQ1 2022: 1 jobQ2 2022: 1 jobQ3 2022: 2 jobsQ4 2022: 2 jobsQ1 2023: 5 jobsQ3 2023: 1 jobQ4 2023: 1 jobQ1 2024: 2 jobsQ2 2024: 1 jobQ3 2024: 1 jobQ2 2025: 3 jobsQ3 2025: 2 jobsQ1 2026: 1 jobQ2 2026: 3 jobsQ3 2026: 2 jobsBusiest: 5 jobsLatest: 2 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, January to March 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787345 jobs
  • 787454 jobs
  • 787573 jobs
  • 787593 jobs
  • 787302 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 15, 2026EV chargerInstall a 60-amp dedicated circuit for a hardwired EV charger78730not stated
Sep 11, 2026Panel upgradeReplace existing 200-amp service with new 350-amp service including a 320-amp meter base a new 3…78704not stated
May 18, 2026Panel upgradeInstall new 500-amp overhead rack service including 500-amp transocket meter base 1 200-amp main…78734not stated
May 4, 2026Panel upgradeUpgrade existing 100-amp service to 200-amp including new wire in existing meter new 200-amp main…78757not stated
Apr 29, 2026Panel upgradeElectrical Meter Service installation for New Construction of SFR. 350-amp rack service with a…78734not stated
Mar 11, 2026Panel upgradeUpgrade electrical service to 200-amps including new meter base riser and 200-amp panel78757not stated
Aug 25, 2025Panel upgradeInstall a new 200-amp meter base (replace existing) and replace exterior main panel (with Square D…78745not stated
Jul 9, 2025SolarAddition/ remodel of existing 2-story single-family residential to include: small addition to…78731not stated
Jun 12, 2025Panel upgradeREQUEST TO DISCONNECT Replace main exterior panel with 225-amp main breaker panel on existing…78730not stated
Apr 7, 2025Panel upgradeReplace the existing meter base with a new 200-amp meter base and replace exterior main panel78745not stated
Apr 2, 2025Panel upgradeReplace existing rag service with new 200-amp overhead riser 200-amp meter base and new main…78759not stated
Sep 11, 2024Panel upgradeRebuild electric service including new 1 point rack riser 200-amp meter base and 200-amp main…78733not stated
Apr 3, 2024Panel upgrade, 4950 sq ftElectrical Meter Service installation for New Construction of SFR in the ETJ. New 350-amp…78734not stated
Mar 29, 2024Panel upgradeUpgrade main overhead electrical service to 200 amps including new 200 amp meter base new exterior…78757not stated
Mar 8, 2024Panel upgradeReplace existing 200-amp service with new 350-amp service including a 320-amp meter base a new 3…78745not stated
Oct 6, 2023Panel upgradeEMERGENCY SERVICE REPAIR - Tree fell on overhead service drop78753not stated
Aug 31, 2023Panel upgrade*REQUEST TO DISCONNECT* Disconnect AE power at meter. Install new main circuit breaker in existing…78729not stated
Mar 23, 2023Panel upgrade2023 Winter Weather Event Replace electrical service including 200-amp meter base 30 space 200-amp…78746not stated
Feb 17, 2023Panel upgrade2023 Winter Weather Event Replace main electrical panel meter base and electrical riser due to ice…78733not stated
Feb 7, 2023Panel upgrade2023 Winter Weather Event Replace storm-damaged 200-amp meter base with new 200 amp meter base…78759not stated
Feb 6, 2023Panel upgrade2023 Winter Weather Event Replace electrical service including 200-amp meter base 40 space 200-amp…78759not stated
Jan 25, 2023Panel upgradeRebuild electrical service with 320 amp meter base and 350 amp service with 2 new electrical panels78734not stated
Nov 21, 2022Panel upgradeInstall new electrical service including new 200-amp meter base new 200-amp feed through main…78734not stated
Oct 26, 2022Panel upgradeUpgrade service to 350-amp rack service including new 320-amp meterbase and main electrical panels78738not stated
Jul 22, 2022Panel upgradeNo details on the permit78750not stated
Jul 5, 2022Panel upgradeNo work done78752not stated
Jun 17, 2022Panel upgradeReplace existing meter base and main electrical panel78705not stated
Feb 11, 2022Panel upgradeInterior remodel: replace windows and doors78745not stated
Dec 13, 2021Panel upgradeReplace main outdoor electrical panel (existing FPE panel)78735not stated
Dec 6, 2021Panel upgrade, 500 sq ft*Partial demo* New deck 500 sq ft78750not stated
Nov 22, 2021Panel upgradeService to be relocated around the corner with new meter base and panel78746not stated

What to ask before you hire

About Matt Parker Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Matt Parker Electric LLC

Five quick questions. We pass your request to Matt Parker Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Matt Parker Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78734 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.