Bear Electric LLC
Panel upgrade electrician working in Austin.
- License active
49 jobs on Austin permits, 2021 to 2026: 34 panel upgrades, 14 EV charger installations, 1 solar installation. 31st most panel upgrade permits of 327 contractors in Austin.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Texas electrical contractor license 34992, valid until Mar 8, 2027We matched it by the phone on their permits. | Checks out |
| Jobs on record | 49 jobs on Austin permits, 2021 to 2026: 34 panel upgrades, 14 EV charger installations, 1 solar installation31st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026. |
Records: City of Austin permits.
Cost and timing
Permit timeline
Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.
Track record
12 jobs in the last 12 months, down from 15 the year before
Where they work most
- 787299 jobs
- 787316 jobs
- 787504 jobs
- 787594 jobs
- 787573 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 22, 2026 | Panel upgradePEC power provider | 78717 | not stated |
| Aug 10, 2026 | Panel upgradeProperty has pedestal with meter and main breaker at the street | 78750 | not stated |
| Jul 14, 2026 | Panel upgradeReplace existing 200 amp main panel and meter with new main panel and meter to current code | 78757 | not stated |
| Jul 10, 2026 | Panel upgradeNot touching PEC meter | 78750 | not stated |
| Jun 26, 2026 | Panel upgradeReplace existing meter and panel with new 225 amp | 78732 | not stated |
| May 2, 2026 | Panel upgradeRequest to disconnect replacing existing 200 amp main panel with a new 200 amp automatic transfer… | 78731 | not stated |
| Mar 24, 2026 | EV chargerHardwire EV charger in garage | 78759 | not stated |
| Feb 6, 2026 | Panel upgradeInstall EV charger 10 from main panel | 78731 | not stated |
| Feb 6, 2026 | EV chargerInstall EV charger 10 from main panel | 78731 | not stated |
| Jan 27, 2026 | Panel upgradeRequest to disconnect Not touching / leaving line side conductors and meter can | 78729 | not stated |
| Jan 27, 2026 | EV chargerRequest to disconnect Not touching / leaving line side conductors and meter can | 78729 | not stated |
| Dec 18, 2025 | Panel upgradeReuse existing condenser wire run new wiring for air handler from attic back to panel | 78750 | not stated |
| Apr 21, 2025 | Solar, 20 kWInstall 20 KW Kohler generator | 78730 | not stated |
| Apr 14, 2025 | Panel upgradeRequest to disconnect Update existing overhead 200amp meter loop including meter panel mast… | 78729 | not stated |
| Mar 21, 2025 | Panel upgradeRequest to disconnect leave existing 200 and meter replace main panel with new 200 amp | 78738 | not stated |
| Mar 6, 2025 | Panel upgradeRequest to disconnect Replace service with new 200 A meter and panel | 78759 | not stated |
| Mar 5, 2025 | Panel upgradeRequest to disconnect replacing two main panels with automatic transfer switch load center combos | 78746 | not stated |
| Feb 22, 2025 | Panel upgradeRequest to disconnect leave existing 200 amp meter and replace main panel with like | 78732 | not stated |
| Feb 19, 2025 | EV chargerAdd EV 14-50 gfci plug in garage | 78729 | not stated |
| Feb 3, 2025 | Panel upgradeRequest to disconnect Not touching existing 200 amp meter can | 78733 | not stated |
| Oct 23, 2024 | EV chargerAdd 2 EV charging stations on front of house | 78729 | not stated |
| Oct 22, 2024 | Panel upgradeAddition/remodel | 78731 | not stated |
| Oct 16, 2024 | Panel upgradeMain service Replace w/ new 200 amp meter and panel | 78729 | not stated |
| Oct 16, 2024 | EV chargerMain service Replace w/ new 200 amp meter and panel | 78729 | not stated |
| Oct 7, 2024 | Panel upgradeRequest to disconnect cut AE wires and secure | 78745 | not stated |
| Oct 4, 2024 | Panel upgradeEV charger under panel | 78749 | not stated |
| Oct 4, 2024 | EV chargerEV charger under panel | 78749 | not stated |
| Aug 12, 2024 | Panel upgrade, 26 kWRequest to disconnect Leave existing 200 amp meter | 78746 | not stated |
| Jul 31, 2024 | Panel upgrade, 22 kWRequest to Disconnect 200 amp meter and panel upgrade | 78745 | not stated |
| Jul 31, 2024 | EV charger, 22 kWRequest to Disconnect 200 amp meter and panel upgrade | 78745 | not stated |
| Jul 1, 2024 | Panel upgradeRequest to disconnect Leave AE wires attached to riser replace main conductors 200 amp meter can… | 78759 | not stated |
| Jul 1, 2024 | EV chargerAdd EV 60amp charger | 78752 | not stated |
| Jun 21, 2024 | Panel upgradeReplace meter with new | 78730 | not stated |
| May 15, 2024 | Panel upgradeRequest to disconnect | 78728 | not stated |
| May 10, 2024 | Panel upgradeRequest to disconnect leave existing mast at overhead service replace meter can and main panel to… | 78722 | not stated |
| May 8, 2024 | Panel upgradeRequest to disconnect leave existing meter install new 300 amp automatic transfer switch re-feed… | 78732 | not stated |
| Apr 29, 2024 | Panel upgradeRequest to disconnect Meter location slide to the left roughly 16 new riser penetrate the roof | 78757 | not stated |
| Apr 17, 2024 | Panel upgradeRequest to disconnect Not touching meter installing new 300 amp ATS to the left of existing 300 amp… | 78731 | not stated |
| Mar 19, 2024 | Panel upgradeNo details on the permit | 78729 | not stated |
| Jan 29, 2024 | Panel upgrade*request to disconnect* overhead service Requesting to leave existing one point attachment and 2… | 78751 | not stated |
What to ask before you hire
About Bear Electric LLC
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Bear Electric LLC
Five quick questions. We pass your request to Bear Electric LLC.
Request for Bear Electric LLC
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Bear Electric LLC. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 78729 and 78731
- Jonestown Electrical Solutions LLC
- Salt Light & Electric
- Abc Home & Commercial Services
- Magnify Electric
- Trutec Electric
- Volthouse Eletric LLC
See all 327 panel upgrade electricians in Austin, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.