contractors.fyi
Sign in

Bright Now Electric

Panel upgrade electrician working in Austin.

  • No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same city

3 panel upgrade jobs on Austin permits, 2022 to 2026. 283rd most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same cityLook them up on the state's license search.Ask them
Jobs on record3 panel upgrade jobs on Austin permits, 2022 to 2026Every permit we have for them is panel upgrade.283rd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Where they work most

  • 787452 jobs
  • 787211 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 30, 2026Panel upgradeConversion of a portion of attached garage into enclosed and conditioned mudroom78745not stated
Apr 20, 2026Panel upgradeRemoving old generator and defective transfer switch to a disconnect between meter and panel78721not stated
Nov 7, 2022Panel upgradeIm repairing conduit coming in on service side before meter and replacing old panel and installing…78745not stated

What to ask before you hire

About Bright Now Electric

  • Ask for their electrical contractor license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bright Now Electric

Five quick questions. We pass your request to Bright Now Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bright Now Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78721

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.