contractors.fyi
Sign in

Bryant Electric Service

Panel upgrade electrician working in Austin.

  • No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same city

19 jobs on Austin permits, 2021 to 2025: 14 panel upgrades, 5 EV charger installations. 91st most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same cityLook them up on the state's license search.Ask them
Jobs on record19 jobs on Austin permits, 2021 to 2025: 14 panel upgrades, 5 EV charger installations91st most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q3 2021: 1 jobQ1 2022: 3 jobsQ2 2022: 5 jobsQ3 2022: 1 jobQ3 2023: 1 jobQ1 2024: 2 jobsQ3 2024: 1 jobQ1 2025: 1 jobQ2 2025: 4 jobsBusiest: 5 jobsLatest: 4 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2022.

Where they work most

  • 787235 jobs
  • 787313 jobs
  • 787452 jobs
  • 787592 jobs
  • 787572 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
May 30, 2025Panel upgrade5/30/25 SM - SFR Storm damage (Riser meter and MP were detached from the stand alone pole). …78731not stated
May 2, 2025Panel upgradeNew 200A overhead service upgrade78745not stated
Apr 6, 2025Panel upgradeInstall new hardwired car charging station inside garage78759not stated
Apr 6, 2025Panel upgradeInstall new 50A 240V GFCI circuit for NEMA 14-50 outlet to be used for car charging78756not stated
Jan 2, 2025Panel upgradeInstall new dedicated 50 Amp GFCI outlet in garage fed from main panel approx 65ft away via 1 EMT…78749not stated
Sep 6, 2024Panel upgradeHardwired Level 2 car charging station78745not stated
Mar 20, 2024Panel upgradeUpgrade duplex service to 125 Amps78723not stated
Jan 15, 2024Panel upgradeRag loop service upgrade to 200A residential service78757not stated
Aug 18, 2023Panel upgrade, 10.5 kW200A OH service upgrade78757not stated
Sep 30, 2022Panel upgradeCar charging station to be installed adjacent to sub panel in garage78753not stated
May 26, 2022Panel upgradeEmergency permit required78759not stated
May 24, 2022Panel upgradeInstall a circuit from main panel on back of home to EV charging receptacle78731not stated
May 24, 2022EV chargerInstall a circuit from main panel on back of home to EV charging receptacle78731not stated
Apr 3, 2022EV chargerInstall 50 amp circuit for electric car charger78723not stated
Apr 3, 2022EV chargerAdd 50 amp circuit for electric vehicle charger78702not stated
Feb 24, 2022Panel upgradeAdd power from existing panel in storage closet to back wall of the garage for a level 2 electric…78723not stated
Feb 24, 2022EV chargerAdd power from existing panel in storage closet to back wall of the garage for a level 2 electric…78723not stated
Feb 8, 2022EV chargerRun a new circuit for a 50A EV car charger78730not stated
Sep 28, 2021Panel upgradeFPE Panel upgrade for exterior panel78723not stated

What to ask before you hire

About Bryant Electric Service

  • Ask for their electrical contractor license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bryant Electric Service

Five quick questions. We pass your request to Bryant Electric Service.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bryant Electric Service. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78723 and 78731

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.