contractors.fyi
Sign in

Copperhead Electrical Services LLC

Panel upgrade electrician working in Austin.

  • License active

17 jobs on Austin permits, 2023 to 2026: 13 panel upgrades, 4 EV charger installations. 97th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 37794, valid until Feb 1, 2027We matched it by the phone on their permits.Checks out
Jobs on record17 jobs on Austin permits, 2023 to 2026: 13 panel upgrades, 4 EV charger installations97th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

12 jobs in the last 12 months, up from 1 the year before

Q3 2023: 1 jobQ2 2024: 2 jobsQ3 2024: 1 jobQ2 2025: 1 jobQ4 2025: 1 jobQ1 2026: 1 jobQ2 2026: 6 jobsQ3 2026: 4 jobsBusiest: 6 jobs202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, April to June 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787443 jobs
  • 787022 jobs
  • 787232 jobs
  • 787452 jobs
  • 787322 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 21, 2026Panel upgradeDescription Installationg of a hard wire EV charger 48 amps 240V will be install in a 60 amp…78702not stated
Sep 21, 2026EV chargerDescription Installationg of a hard wire EV charger 48 amps 240V will be install in a 60 amp…78702not stated
Sep 15, 2026Panel upgradeInstallation of an electrical charger for an Tesla Wall mount connector 48 Amps78723not stated
Jul 9, 2026Panel upgradeReplacing old zinsco sub panel inside with new current panel78745not stated
Jun 10, 2026Panel upgradeInstallation of a hardwired EV charger inside garage78744not stated
Jun 10, 2026EV chargerInstallation of a hardwired EV charger inside garage78744not stated
May 17, 2026Panel upgradeInstalling an EV Tesla wall charger78732not stated
May 17, 2026EV chargerInstalling an EV Tesla wall charger78732not stated
May 12, 2026Panel upgradeReplacing 125 amp panel due to damage78744not stated
May 12, 2026EV chargerPermit for a Euphoria EV charger 60 amp circuit inside a garage78723not stated
Mar 12, 2026Panel upgradeUpgrade electrical meter base and Panel box to new 200 amp service overhead drop78727not stated
Dec 15, 2025Panel upgradeUpgrade the electrical service panel box to a new one78739not stated
Jun 20, 2025Panel upgradeUpgrading main panel service disconnect into a 200 amp breaker disconnect78734not stated
Aug 27, 2024Panel upgradeReplacement of panel from 100amp to 200 amp main panel78739not stated
Jun 7, 2024Panel upgradeRequest to disconnect. Replacing Existing Meter Can and Electrical Panel78703not stated
Jun 7, 2024Panel upgradeReplacing existing Electrical Panel78727not stated
Sep 12, 2023Panel upgradeInstalling Generator with transfer switch onto main panel78745not stated

What to ask before you hire

About Copperhead Electrical Services LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Copperhead Electrical Services LLC

Five quick questions. We pass your request to Copperhead Electrical Services LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Copperhead Electrical Services LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78744 and 78702

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.