contractors.fyi
Sign in

Creative Electrical Solutions

Panel upgrade electrician working in Austin.

  • License active

30 panel upgrade jobs on Austin permits, 2024 to 2026. 34th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 38560, valid until Oct 3, 2027We matched it by the phone on their permits.Checks out
Jobs on record30 panel upgrade jobs on Austin permits, 2024 to 2026Every permit we have for them is panel upgrade.34th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

17 jobs in the last 12 months, up from 7 the year before

Q1 2024: 2 jobsQ2 2024: 3 jobsQ3 2024: 1 jobQ1 2025: 1 jobQ2 2025: 3 jobsQ3 2025: 3 jobsQ4 2025: 4 jobsQ1 2026: 5 jobsQ2 2026: 4 jobsQ3 2026: 4 jobsBusiest: 5 jobs202420252026
Each bar is 3 months of permits. The tallest is 5 jobs, January to March 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787455 jobs
  • 787024 jobs
  • 787043 jobs
  • 787573 jobs
  • 787312 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 10, 2026Panel upgradeEmergency meter can replace78753not stated
Jul 29, 2026Panel upgrade**disconnect and reconnect form AUSTIN ENERGY**Replace a 20 space 200-amp main panel for a 30 space78704not stated
Jul 6, 2026Panel upgrade, 200 sq ftLess than 200 sq ft concrete slab electrical wiring with a few receptacles general lighting a 220v78731not stated
Jul 6, 2026Panel upgradeWiring a free-standing shed with a 50-amp subpanel78723not stated
Jun 28, 2026Panel upgradeMy Client needs the 2 riggid conduit Riser extended higher up 24 the service entrance wires inside…78702not stated
Jun 28, 2026Panel upgrade200-amp service is existing78717not stated
Jun 16, 2026Panel upgrade200-amp meter and panel upgrade78745not stated
Apr 21, 2026Panel upgrade78727not stated
Mar 25, 2026Panel upgradeUpgrade to 200 AMP service78731not stated
Mar 4, 2026Panel upgrade400 AMP service upgrade 2 meters 2 main disconnect panels stand alone78751not stated
Jan 29, 2026Panel upgrade200-amp meter can and main panel upgrade78702not stated
Jan 28, 2026Panel upgradeExpress: Replace sub and main electric panel install new lighting install new faucets and…78757not stated
Jan 13, 2026Panel upgrade78757not stated
Dec 29, 2025Panel upgradeNo details on the permit78704not stated
Dec 16, 2025Panel upgradeAccording to the inspector Sean McMullen A separate permit needs to be approved different from the…78703not stated
Nov 23, 2025Panel upgrade78758not stated
Nov 10, 2025Panel upgrade200-amp Panel and meter upgrade78758not stated
Aug 22, 2025Panel upgradeStandalone permit78723not stated
Aug 13, 2025Panel upgrade78745not stated
Jul 17, 2025Panel upgrade78757not stated
Jun 27, 2025Panel upgrade78702not stated
Jun 3, 2025Panel upgrade200-amp panel upgrade requires meter work78750not stated
Jun 2, 2025Panel upgrade, 200 sq ftProvide power to a 200 sq ft free-standing shed with a 50-amp sub-panel78702not stated
Feb 5, 2025Panel upgrade, 160 sq ftWire a free-standing 160 sqft shed78750not stated
Jul 2, 2024Panel upgrade200 amp main electrical panel upgrade78704not stated
Apr 29, 2024Panel upgradePANEL AND METER UPGRADE for main house only78745not stated
Apr 29, 2024Panel upgradeUpgrade a 200 amp panel and 200amp meter78729not stated
Apr 16, 2024Panel upgradeUpgrade Panel78751not stated
Mar 18, 2024Panel upgrade, 160 sq ftWiring a shed adding a panel to shed lighting 160 sq ft78745not stated
Mar 15, 2024Panel upgrade, 160 sq ftWiring a shed adding a panel to shed lighting 160 sq ft78745not stated

What to ask before you hire

About Creative Electrical Solutions

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Creative Electrical Solutions

Five quick questions. We pass your request to Creative Electrical Solutions.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Creative Electrical Solutions. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78745 and 78702

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.