contractors.fyi
Sign in

Double D Electric

Panel upgrade electrician working in Austin.

  • License active

6 panel upgrade jobs on Austin permits, 2023 to 2024. 187th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 27548, valid until Apr 20, 2027We matched it by the phone on their permits.Checks out
Jobs on record6 panel upgrade jobs on Austin permits, 2023 to 2024Every permit we have for them is panel upgrade.187th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q2 2023: 1 jobQ4 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 2 jobsBusiest: 2 jobs2024
Each bar is 3 months of permits. The tallest is 2 jobs, July to September 2024.

Where they work most

  • 787491 job
  • 787451 job
  • 787311 job
  • 787581 job
  • 787481 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Aug 2, 2024Panel upgradeReplace existing outdated electrical panel and meter and rebuild electrical service in existing…78749not stated
Aug 2, 2024Panel upgradeRemove existing outdated electrical meter and panel and install new meter and panel in same…78745not stated
Jun 3, 2024Panel upgradeReplacing the electrical meter and panel78731not stated
Mar 29, 2024Panel upgradeReplace outdated existing electrical panel and meter78758not stated
Nov 28, 2023Panel upgradeUpgrade existing electrical meter and panel ONLY78748not stated
May 3, 2023Panel upgradeRelocate electrical overhead service to new pod structure install new underground power feed from…78702not stated

What to ask before you hire

About Double D Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Double D Electric

Five quick questions. We pass your request to Double D Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Double D Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78749 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.