contractors.fyi
Sign in

Duhon Electric

EV charger installer working in Austin.

  • License active

17 jobs on Austin permits, 2021 to 2025: 12 EV charger installations, 5 panel upgrades. 30th most EV charger permits of 93 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 26523, valid until Aug 18, 2027We matched it by the business name in the same city, Austin.Checks out
Jobs on record17 jobs on Austin permits, 2021 to 2025: 12 EV charger installations, 5 panel upgrades30th most EV charger permits of 93 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a EV charger permit stays open about 6 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 5 days. How long EV charger jobs take.

Track record

0 jobs in the last 12 months, down from 6 the year before

Q4 2021: 2 jobsQ2 2022: 2 jobsQ3 2022: 1 jobQ3 2023: 1 jobQ4 2023: 1 jobQ1 2024: 1 jobQ2 2024: 2 jobsQ3 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 2 jobsQ3 2025: 2 jobsBusiest: 2 jobsBusiest: 2 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 2 jobs, October to December 2021. Across Austin, all contractors together had 12% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787315 jobs
  • 787574 jobs
  • 787512 jobs
  • 787031 job
  • 787461 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 15, 2025Panel upgradeRebuilding and upgrading overhead electrical service to 200A on NE corner of house78731not stated
Aug 29, 2025Panel upgradeReplacement of exterior electrical panel78703not stated
Feb 26, 2025EV chargerInstallation of level 2 EV charger in garage78731not stated
Feb 24, 2025EV chargerInstallation of level 2 EV charger78746not stated
Oct 8, 2024EV chargerInstallation of a hard-wired level 2 EV charger78748not stated
Oct 8, 2024EV chargerInstallation of power for a level 2 EV charger78757not stated
Jul 23, 2024EV chargerInstallation of EVSE78756not stated
Jun 11, 2024EV chargerInstallation of EVSE78757not stated
May 15, 2024EV chargerInstalled EVSE in Garage78702not stated
Jan 12, 2024EV chargerInstallation of a Level 2 EVSE in garage78745not stated
Oct 24, 2023Panel upgradeRequest to Disconnect - Replacing undersized main panel78731not stated
Sep 15, 2023Panel upgradeChanging Main Panel78731not stated
Sep 28, 2022EV chargerInstalled GFCI protected dedicated 220v/20amp circuit to exterior outlet with extra-duty in-use…78751not stated
May 19, 2022EV chargerInstalling exterior outlet for Level 2 EVSE78757not stated
May 11, 2022EV chargerInstalling Level 2 EVSE78731not stated
Nov 10, 2021EV chargerInstalling circuit for a Level-2 EVSE78757not stated
Nov 10, 2021Panel upgradeRelocating/Rebuilding Electrical Service on detached garage running underground power to house and…78751not stated

What to ask before you hire

About Duhon Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Duhon Electric

Five quick questions. We pass your request to Duhon Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Duhon Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 78731 and 78757

See all 93 EV charger installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.