contractors.fyi
Sign in

Team Enoch

EV charger installer working in Austin.

  • License active

32 jobs on Austin permits, 2023 to 2026: 20 EV charger installations, 11 panel upgrades, 1 heat pump installation. 20th most EV charger permits of 93 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 31529, valid until Feb 5, 2027We matched it by the phone on their permits.Checks out
Jobs on record32 jobs on Austin permits, 2023 to 2026: 20 EV charger installations, 11 panel upgrades, 1 heat pump installation20th most EV charger permits of 93 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 20 EV charger permits, 4 mention a panel upgrade.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a EV charger permit stays open about 6 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 5 days. How long EV charger jobs take.

Track record

6 jobs in the last 12 months, down from 10 the year before

Q4 2023: 5 jobsQ1 2024: 1 jobQ2 2024: 6 jobsQ3 2024: 4 jobsQ4 2024: 3 jobsQ1 2025: 2 jobsQ2 2025: 2 jobsQ3 2025: 4 jobsQ1 2026: 1 jobQ3 2026: 4 jobsBusiest: 6 jobsLatest: 4 jobs202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, April to June 2024. Across Austin, all contractors together had 12% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787303 jobs
  • 787442 jobs
  • 787582 jobs
  • 787232 jobs
  • 787592 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 30, 2026Panel upgradeInstalling 1. EV Charger (Hardwired) 2. 200A Meter Main Panel (Replacement) 3. 50A Garage Sub-Panel…78744not stated
Jul 30, 2026EV chargerInstalling 1. EV Charger (Hardwired) 2. 200A Meter Main Panel (Replacement) 3. 50A Garage Sub-Panel…78744not stated
Jul 17, 2026EV chargerHardwire EV Charger78757not stated
Jul 2, 2026EV chargerNo details on the permit78746not stated
Mar 19, 2026EV chargerEV Charger replacement78703not stated
Sep 23, 2025Panel upgradePanel upgrade and deletion of indoor panel78758not stated
Sep 15, 2025EV chargerInstallation of a tesla car charger78747not stated
Jul 16, 2025EV chargerNo details on the permit78723not stated
Jul 14, 2025Panel upgradeInstallation of a Hyundai Chargpoint flex charger to be installed with #6 wire and 60A breaker next…78726not stated
Apr 23, 2025Panel upgradeInstallation of a Charepoint charger to be hardwired next to 200A main panel with #6 wire78754not stated
Apr 7, 2025Heat pumpReplacement of complete existing central heat and air system with or without duct work Trane 2 ton…78730not stated
Feb 11, 2025EV chargerInstallation of a 48A level 2 car charger to be hardwired78759not stated
Jan 9, 2025Panel upgradeInstallation of a dedicated 60 Amp circuit within 100 of electrical panel in the garage and…78723not stated
Dec 11, 2024Panel upgradeEV charger installation next to panel78733not stated
Dec 11, 2024EV chargerEV charger installation next to panel78733not stated
Oct 9, 2024EV chargerInstallation of a hardwired juicebox 48A level two car charger on 60A breaker with #6 wire78717not stated
Sep 11, 2024Panel upgradeHardwired 48A Juicebox EV charger on 200A panel78750not stated
Sep 11, 2024EV chargerHardwired 48A Juicebox EV charger on 200A panel78750not stated
Sep 10, 2024EV chargerInstall new 20 amp 240V circuit for exterior EV charger78758not stated
Jul 16, 2024EV charger40 breaker with #8 wire for level two car charger78741not stated
Jun 24, 2024EV chargerInstallation of a hardwired 60A level 2 Emporia car charger78727not stated
Jun 20, 2024Panel upgradeInstallation of a 60A circuit for a 48A emopria level two car charger in 200A main panel78730not stated
Jun 20, 2024EV chargerInstallation of a 60A circuit for a 48A emopria level two car charger in 200A main panel78730not stated
Jun 18, 2024Panel upgradeTesla home charger install 65 of panel78704not stated
Apr 18, 2024Panel upgradeHardwire a chargepoint flex charger next to panel with #6 wire and 50A breaker78727not stated
Apr 17, 2024EV chargerInstallation of a 60A breaker and up to 50 feet of surface mounted conduit for the installation of…78759not stated
Feb 23, 2024EV chargerInstallation of a level two car charger with #6 wire on 50A breaker78731not stated
Dec 13, 2023EV chargerInstallation of a hardwired level two EV charger78734not stated
Nov 7, 2023EV chargerInstallation of hardwired level 2 EV charger on a 50 amp circuit78702not stated
Oct 30, 2023EV chargerInstallation of a level 2 car charger dedicated circuit78745not stated
Oct 24, 2023EV chargerInstallation of Level 2 car charger78732not stated
Oct 20, 2023Panel upgradeReplacing the electrical panel and the meter base78745not stated

What to ask before you hire

About Team Enoch

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Team Enoch

Five quick questions. We pass your request to Team Enoch.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Team Enoch. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 78730 and 78744

See all 93 EV charger installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.