contractors.fyi
Sign in

Edt Electric LLC

Panel upgrade electrician working in Austin.

  • License active

5 panel upgrade jobs on Austin permits, 2024 to 2025. 213th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 33677, valid until Jun 12, 2027We matched it by the phone on their permits.Checks out
Jobs on record5 panel upgrade jobs on Austin permits, 2024 to 2025Every permit we have for them is panel upgrade.213th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Where they work most

  • 787442 jobs
  • 787451 job
  • 787211 job
  • 787241 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 13, 2025Panel upgradeMain service upgrade to 150A78744not stated
May 28, 2025Panel upgradeService upgrade to 150A78744not stated
Jan 15, 2025Panel upgradeUpgrade existing Federal Pacific to 200A single phase 120/240v MCB panel board78745not stated
Nov 4, 2024Panel upgradeExpress: Plumbing work (add tankless water heater and add gas lines mechanical (adding 3 mini split…78721not stated
Sep 12, 2024Panel upgradeUpgrade existing single metered main to 2-200A metered mains with 2 main panelboards78724not stated

What to ask before you hire

About Edt Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Edt Electric LLC

Five quick questions. We pass your request to Edt Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Edt Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78744 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.