contractors.fyi
Sign in

Grizzly and Sons Electric LLC

Panel upgrade electrician working in Austin.

  • License active

16 jobs on Austin permits, 2022 to 2024: 13 panel upgrades, 2 EV charger installations, 1 solar installation. 99th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 35704, valid until Mar 18, 2027We matched it by the phone on their permits.Checks out
Jobs on record16 jobs on Austin permits, 2022 to 2024: 13 panel upgrades, 2 EV charger installations, 1 solar installation99th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q2 2022: 1 jobQ4 2022: 3 jobsQ3 2023: 7 jobsQ4 2023: 4 jobsQ4 2024: 1 jobBusiest: 7 jobs20232024
Each bar is 3 months of permits. The tallest is 7 jobs, July to September 2023.

Where they work most

  • 787463 jobs
  • 787042 jobs
  • 787312 jobs
  • 787491 job
  • 787451 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 9, 2024EV chargerInstallation on 48amp Tesla EV charger78704not stated
Oct 30, 2023Panel upgradeREQUEST TO DISCONNECT 20 electrical panel replacement upgrade to 150amp78749not stated
Oct 28, 2023Panel upgrade, 22 kWRequest to disconnect 22 kW Generator with 200amp service78745not stated
Oct 17, 2023Panel upgradeREQUEST TO DISCONNECT replacing generator and main panel78731not stated
Oct 17, 2023Panel upgradeREQUEST TO DISCONNECT 2 panels (200amp and 150amp)78731not stated
Sep 29, 2023Panel upgradeREQUEST TO DISCONNECT-Installation of a 200 A ATS and new panel replacement78752not stated
Sep 27, 2023Solar, 60 kWREQUEST TO DISCONNECT-60KW 2 ATS with Solar and Batteries78704not stated
Sep 22, 2023Panel upgradeMeter and panel upgrade78746not stated
Sep 21, 2023Panel upgrade** Request to Disconnect We are upgrading the meter and the elctrical panel to 200 A. We are also…78727not stated
Aug 8, 2023Panel upgradeShutdown required for 200 AMP service upgrade78724not stated
Aug 6, 2023Panel upgrade, 80 kWRequest for Disconnect 80KW Install 600 amp ATS panel78733not stated
Aug 6, 2023Panel upgrade, 60 kWRequest to Disconnect The project currently shows a 400Amp service78746not stated
Dec 19, 2022Panel upgradeShutdown required for service upgrade generator and ATS install78746not stated
Dec 19, 2022Panel upgradeShutdown required for service upgrade78753not stated
Dec 11, 2022Panel upgradeInterior remodel: Demolition of several interior walls plumbing fixtures kitchen appliances…78758not stated
Jun 21, 2022EV chargerInstallation of an EV Charging station78759not stated

What to ask before you hire

About Grizzly and Sons Electric LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Grizzly and Sons Electric LLC

Five quick questions. We pass your request to Grizzly and Sons Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Grizzly and Sons Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78746 and 78704

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.