contractors.fyi
Sign in

Kw Electric

Panel upgrade electrician working in Austin.

  • License active

26 jobs on Austin permits, 2021 to 2024: 11 panel upgrades, 8 solar installations, 7 EV charger installations.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 20968, valid until Apr 1, 2027We matched it by the business name in the same city, Cedar Creek.Checks out
Jobs on record26 jobs on Austin permits, 2021 to 2024: 11 panel upgrades, 8 solar installations, 7 EV charger installationsOur Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 12 jobsQ1 2022: 1 jobQ3 2022: 1 jobQ4 2022: 2 jobsQ1 2023: 1 jobQ2 2023: 2 jobsQ4 2023: 1 jobQ1 2024: 1 jobQ3 2024: 3 jobsQ4 2024: 2 jobsBusiest: 12 jobsLatest: 2 jobs202220232024
Each bar is 3 months of permits. The tallest is 12 jobs, October to December 2021.

Where they work most

  • 7874411 jobs
  • 787232 jobs
  • 787592 jobs
  • 787032 jobs
  • 787532 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Oct 29, 2024Panel upgradeNo details on the permit78744not stated
Oct 29, 2024EV chargerNo details on the permit78744not stated
Sep 24, 2024Panel upgradeInstall (1) Level 2 EV Charger on exterior wall of garage wall78744not stated
Sep 24, 2024EV chargerInstall (1) Level 2 EV Charger on exterior wall of garage wall78744not stated
Aug 1, 2024EV chargerInstall a 20-amp GFCI protected EV charger circuit78727not stated
Feb 28, 2024Panel upgradeEmergency overhead 150-amp service rebuild78723not stated
Oct 10, 2023Panel upgrade, 18 kW200-amp electrical service upgrade and 18kW automatic standby generator installation78759not stated
Apr 14, 2023Panel upgradeInstall a 120v weatherproof outlet for a Level 1 car charger78703not stated
Apr 14, 2023EV chargerInstall a 120v weatherproof outlet for a Level 1 car charger78703not stated
Mar 8, 2023EV chargerInstall EV charger circuit water heater circuit and electric range circuit78753not stated
Oct 14, 2022SolarInstallation of PV Solar System with ESS to meet base load78759not stated
Oct 6, 2022EV chargerInstall a 40-amp EV charger circuit78751not stated
Sep 19, 2022EV chargerInstall 50-amp circuit in conduit and 50-amp receptacle for EV charger78723not stated
Jan 21, 2022SolarNew Solar System Installation-MANDUJANO - Sabrina78747not stated
Nov 15, 2021SolarJimenez - To install a roof solar system78744not stated
Nov 3, 2021Panel upgradeTo upgrade the main panel78753not stated
Nov 3, 2021Panel upgradeMandujano Main panel upgrade78747not stated
Nov 3, 2021SolarMain Panel upgrade to install a solar system78744not stated
Nov 3, 2021Panel upgradeG. Gonzalez - Main panel upgrade78744not stated
Nov 3, 2021Panel upgradeJimenez - Main panel upgrade78744not stated
Oct 21, 2021Panel upgradeUpgrade the existing 125a electrical service to 200a78731not stated
Oct 16, 2021Solar78725not stated
Oct 16, 2021Solar78744not stated
Oct 16, 2021SolarMejia To install a roof solar system78744not stated
Oct 6, 2021Panel upgradeMain panel upgrade78744not stated
Oct 6, 2021Solar78725not stated

What to ask before you hire

About Kw Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Kw Electric

Five quick questions. We pass your request to Kw Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Kw Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78744 and 78723

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.