Power Factor Electrical
Panel upgrade electrician working in Austin.
- License active
14 jobs on Austin permits, 2021 to 2026: 12 panel upgrades, 2 EV charger installations. 106th most panel upgrade permits of 327 contractors in Austin.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Texas electrical contractor license 34913, valid until Dec 17, 2026We matched it by the phone on their permits. | Checks out |
| Jobs on record | 14 jobs on Austin permits, 2021 to 2026: 12 panel upgrades, 2 EV charger installations106th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026. |
Records: City of Austin permits.
Cost and timing
Permit timeline
Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.
Track record
Jobs per quarter
Where they work most
- 787032 jobs
- 787232 jobs
- 787541 job
- 787221 job
- 786601 job
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Feb 9, 2026 | Panel upgradeReplace main breaker in service panel outside breaker was exposed to moisture and is beginning to… | 78754 | not stated |
| Nov 6, 2025 | Panel upgradeRebuild main electrical overhead service on an occupied dwelling Remove old riser and panel and… | 78703 | not stated |
| Aug 12, 2025 | Panel upgradeInstallation of Emporia pro level 2 EV charger | 78723 | not stated |
| Aug 12, 2025 | EV chargerInstallation of Emporia pro level 2 EV charger | 78723 | not stated |
| Oct 2, 2024 | Panel upgradeRe move and replace damaged riser for over head service a branch from a tree fell on service… | 78722 | not stated |
| Apr 4, 2024 | Panel upgradeReplace meter socket and repair broken conduit to meter socket upgrade to a 200 amp service | 78660 | not stated |
| Feb 14, 2024 | Panel upgradeRemove and replace service change out panel and install new 200 amp panel with main breaker … | 78744 | not stated |
| Jan 25, 2024 | Panel upgradeRemove and rebuild service for both units install neww riser meter sockets and panels and upgrade… | 78703 | not stated |
| Dec 20, 2023 | Panel upgradeExpress: Replace electrical panel Run new can lights Replace lights Replace tub and shower and tile… | 78704 | not stated |
| Aug 17, 2023 | EV chargerInstallation or electric vehicle charger in garage | 78730 | not stated |
| Jun 23, 2023 | Panel upgradeReroute electrical to relocated A/C condensers approx 50 from original location | 78731 | not stated |
| Sep 2, 2022 | Panel upgradeUpgrade outdoor panel due to meter socket being faulty | 78727 | not stated |
| Jan 24, 2022 | Panel upgradeRebuild service upgrade old panel and meter socket and up grade to 200 amp main breaker panel | 78749 | not stated |
| Dec 7, 2021 | Panel upgradeUpgrade electrical service add arc fault breakers installation of new meter socket new outdoor… | 78745 | not stated |
What to ask before you hire
About Power Factor Electrical
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Power Factor Electrical
Five quick questions. We pass your request to Power Factor Electrical.
Request for Power Factor Electrical
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Power Factor Electrical. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 78703 and 78723
- Jonestown Electrical Solutions LLC
- Salt Light & Electric
- Service Company of San Antonio LLC Dba Mr Electric of Austin
- Grizzly and Sons Electric LLC
- James Electric
- D.a.s Electric
See all 327 panel upgrade electricians in Austin, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.