contractors.fyi
Sign in

Lyons Electric Inc.

Panel upgrade electrician working in Austin.

  • License active

8 jobs on Austin permits, 2022 to 2026: 6 panel upgrades, 2 EV charger installations. 197th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 17365, valid until Jul 31, 2027We matched it by the phone on their permits.Checks out
Jobs on record8 jobs on Austin permits, 2022 to 2026: 6 panel upgrades, 2 EV charger installations197th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2022: 1 jobQ1 2023: 1 jobQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 1 jobQ1 2025: 1 jobQ2 2026: 1 jobBusiest: 1 jobBusiest: 1 job20222023202420252026
Each bar is 3 months of permits. The tallest is 1 job, January to March 2022.

Where they work most

  • 787493 jobs
  • 787231 job
  • 787281 job
  • 787501 job
  • 787531 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 29, 2026EV chargerInstall outlet for EV Charger78723not stated
Feb 28, 2025Panel upgradeChange out meter can to 200A and replace existing service panel78728not stated
Oct 10, 2024Panel upgradeI am replacing a 125A panel with the same size panel in order to have room for a generator breaker78750not stated
Apr 5, 2024Panel upgradeReplace old meter with 200Amp meter can; replace old 125A panel with new 125A panel78753not stated
Jan 27, 2024Panel upgradeNo details on the permit78749not stated
Aug 30, 2023Panel upgradeAdd garage panel78749not stated
Feb 11, 2023EV chargerInstall Electrical line for EV charger78759not stated
Mar 9, 2022Panel upgradeReplace electrical panel only at residence78749not stated

What to ask before you hire

About Lyons Electric Inc.

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Lyons Electric Inc.

Five quick questions. We pass your request to Lyons Electric Inc..

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Lyons Electric Inc.. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78749 and 78723

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.