contractors.fyi
Sign in

Malco Electric

Panel upgrade electrician working in Austin.

  • License active

83 jobs on Austin permits, 2021 to 2026: 71 panel upgrades, 12 EV charger installations. 14th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 20588, valid until Nov 23, 2026We matched it by the phone on their permits.Checks out
Jobs on record83 jobs on Austin permits, 2021 to 2026: 71 panel upgrades, 12 EV charger installations14th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

24 jobs in the last 12 months, up from 17 the year before

Q4 2021: 1 jobQ1 2022: 3 jobsQ2 2022: 5 jobsQ3 2022: 6 jobsQ4 2022: 3 jobsQ1 2023: 3 jobsQ2 2023: 1 jobQ3 2023: 8 jobsQ4 2023: 3 jobsQ1 2024: 3 jobsQ2 2024: 2 jobsQ3 2024: 4 jobsQ4 2024: 2 jobsQ1 2025: 5 jobsQ2 2025: 7 jobsQ3 2025: 4 jobsQ4 2025: 3 jobsQ1 2026: 3 jobsQ2 2026: 6 jobsQ3 2026: 11 jobsBusiest: 11 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 11 jobs, July to September 2026. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 7875911 jobs
  • 787048 jobs
  • 787037 jobs
  • 787236 jobs
  • 787586 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 21, 2026Panel upgradeEmergency upgrade of existing 200amp underground service with new panel and meter LIKE FOR LIKE78734not stated
Sep 10, 2026Panel upgradeService upgrade of existing 125amp underground to a new 200amp78759not stated
Sep 10, 2026EV chargerService upgrade of existing 125amp underground to a new 200amp78759not stated
Aug 28, 2026Panel upgradeService upgrade of 125amp overhead with cloth riser to 200amp78723not stated
Aug 18, 2026Panel upgradeService upgrade of existing 125amp with cloth riser to new 200amp overhead78757not stated
Aug 18, 2026Panel upgradeService upgrade of 150amp overhead with failing equipment to a new 200amp78756not stated
Aug 7, 2026Panel upgradeService upgrade of 125amp underground to new 200amp78758not stated
Aug 7, 2026EV chargerService upgrade of 125amp underground to new 200amp78758not stated
Jul 27, 2026EV chargerInstallation of 60amp circuit for a 48amp EV Charging Station78703not stated
Jul 16, 2026EV chargerInstallation of 60amp circuit for EV Charging Station78751not stated
Jul 10, 2026EV chargerInstallation of 60amp circuit for a 48amp hardwired EV Charger78704not stated
Jun 24, 2026EV charger78717not stated
Jun 17, 2026Panel upgradeService upgrade from existing 125amp to new 225amp underground78758not stated
May 9, 2026Panel upgradeService Upgrade of existing 125amp overhead to new 200amp78757not stated
Apr 29, 2026EV chargerInstallation of EV Charging Station78752not stated
Apr 29, 2026EV chargerInstallation of EV Charging Station78703not stated
Apr 20, 2026EV charger78759not stated
Mar 4, 2026EV chargerInstallation of 50amp EV Charger in Garage78757not stated
Feb 27, 2026EV charger78739not stated
Feb 9, 2026Panel upgradeService Upgrade of 125amp overhead service with no main to new 200amp overhead78759not stated
Dec 16, 2025Panel upgradeService Upgrade of a 125amp underground (secondary riser) to new 200amp78727not stated
Oct 15, 2025Panel upgradeReplacement of Main Panel only78726not stated
Oct 15, 2025Panel upgradeService upgrade of a PEC underground 125amp service to 225amp to facilitate future loads78726not stated
Sep 30, 2025Panel upgradeUpgrade of existing 100amp overhead service to new 225amp service78721not stated
Sep 12, 2025Panel upgradeService Upgrade of 125amp underground to new 200amp78759not stated
Sep 8, 2025Panel upgradeService upgrade of existing 200amp service Like for Like with new equipment78747not stated
Jul 15, 2025Panel upgradeREQUEST TO DISCONNECT Service upgrade of 125amp overhead to new 200amp78731not stated
Jun 30, 2025EV chargerInstallation of Residential EV Charging Station78759not stated
Jun 25, 2025Panel upgradeEmergency Service Repair and Upgrade on Duplex with cloth risers Zinsco Panels and no main breakers78704not stated
May 30, 2025Panel upgradeService upgrade of existing 200amp underground with no main to a new 225amp with all new equipment78731not stated
May 1, 2025Panel upgradeEmergency Service Repair and Upgrade of 200amp service to 225amp78703not stated
May 1, 2025Panel upgradeREQUEST TO DISCONNECT Upgrade of existing 100amp service with cloth riser to new 200amp78745not stated
Apr 16, 2025Panel upgradeREQUEST TO DISCONNECT Service Upgrade of 150amp overhead to new 225amp78722not stated
Apr 1, 2025Panel upgradeService upgrade of 125amp underground to 200amp78735not stated
Mar 31, 2025Panel upgradeREQUEST TO DISCONNECT Service upgrade of 125amp overhead to a 200amp78723not stated
Mar 21, 2025Panel upgradeEmergency Service Repair with new panel and meter Like for Like78759not stated
Mar 14, 2025Panel upgradeREQUEST TO DISCONNECT Service upgrade of 125amp overhead service to a 200amp78759not stated
Mar 14, 2025Panel upgradeREQUEST TO DISCONNECT Service upgrade from 200amp to 225amp overhead78703not stated
Jan 3, 2025Panel upgradeREQUEST TO DISCONNECT Load side only panel replacement of 200amp panel due to rusted equipment78738not stated
Nov 4, 2024Panel upgradeService only upgrade for Duplex from 200amp overhead with cloth riser and Federal Pacific Panels to…78722not stated

What to ask before you hire

About Malco Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Malco Electric

Five quick questions. We pass your request to Malco Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Malco Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78759 and 78704

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.