contractors.fyi
Sign in

Matt's Electrical Work

Panel upgrade electrician working in Austin.

  • License active

6 panel upgrade jobs on Austin permits, 2022 to 2026. 199th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 24255, valid until Jan 24, 2027We matched it by the business name in the same city, Austin.Checks out
Jobs on record6 panel upgrade jobs on Austin permits, 2022 to 2026Every permit we have for them is panel upgrade.199th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q3 2022: 1 jobQ1 2023: 1 jobQ2 2024: 1 jobQ4 2025: 1 jobQ3 2026: 2 jobsBusiest: 2 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 2 jobs, July to September 2026.

Where they work most

  • 787502 jobs
  • 787541 job
  • 787331 job
  • 786171 job
  • 787591 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 15, 2026Panel upgradeETJ. Replace existing electrical service panel with a new panel of the same rating78754not stated
Sep 1, 2026Panel upgradeETJ - Service Upgrade78733not stated
Dec 22, 2025Panel upgradePEC-Service upgrade78750not stated
Jun 18, 2024Panel upgradeEmergency service call Service upgrade78617not stated
Mar 1, 2023Panel upgradeRepair and upgrade the panel78750not stated
Jul 6, 2022Panel upgradeRepaire the panel78759not stated

What to ask before you hire

About Matt's Electrical Work

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Matt's Electrical Work

Five quick questions. We pass your request to Matt's Electrical Work.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Matt's Electrical Work. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78750 and 78754

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.