contractors.fyi
Sign in

Power Moves Electrical LLC

Panel upgrade electrician working in Austin.

  • License active

9 panel upgrade jobs on Austin permits, 2022 to 2026. 143rd most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 32853, valid until Sep 15, 2027We matched it by the phone on their permits.Checks out
Jobs on record9 panel upgrade jobs on Austin permits, 2022 to 2026Every permit we have for them is panel upgrade.143rd most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q2 2022: 2 jobsQ3 2022: 1 jobQ4 2022: 1 jobQ3 2023: 1 jobQ2 2024: 1 jobQ4 2025: 1 jobQ3 2026: 2 jobsBusiest: 2 jobsBusiest: 2 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 2 jobs, April to June 2022.

Where they work most

  • 787582 jobs
  • 787451 job
  • 787231 job
  • 787501 job
  • 787441 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 4, 2026Panel upgradeReplace federal pacific electric panel and upgrade service to 200amp78745not stated
Aug 19, 2026Panel upgradeEmergency - Replace existing overhead electrical service with new 200-amp service due to existing…78723not stated
Nov 3, 2025Panel upgradeUpgrade/relocate existing 200 amp service to new 400 amp service78750not stated
May 20, 2024Panel upgradeRebuild main service to new 200 amp service78744not stated
Aug 29, 2023Panel upgradeUpgrade existing service to new 200amp service78748not stated
Dec 21, 2022Panel upgradeUpgrade existing service to new 200 amp service78758not stated
Jul 4, 2022Panel upgradeUpgrade existing electrical service to new 200 amp service78704not stated
Apr 7, 2022Panel upgradeUpgrade existing 125 amp service to new 200 amp service78660not stated
Apr 7, 2022Panel upgradeReplace existing service with 200 amp meter and panel add subpanel outside78758not stated

What to ask before you hire

About Power Moves Electrical LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Power Moves Electrical LLC

Five quick questions. We pass your request to Power Moves Electrical LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Power Moves Electrical LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78758 and 78745

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.